F10A/0389: Retain the existing 20m high, free standing wooden pole communication
Mountgorry 38kv Substation, Chapel Lane, Swords, Co. Dublin
DecisionGrant permission for retention
Decided04 May 2011
Application typeRetention
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Mountgorry 38kv Substation, Chapel Lane, Swords, Co. Dublin?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- F16A/0090The continued use of the existing 20m. high, free standing wooden pole / 0.0 km away / 03 May 2016Granted
- F21A/0414The installation of a photovoltaic solar array to be mounted on the rooftop of an existing industrial building. The proposed development includes the provision of approximately 4,300m2 of photovoltaic solar panels, mounting frames, inverters, electrical cabling and all associated ancillary infrastructure. / 0.1 km away / 13 September 2021Granted
- F23A/0394Conversion of the existing structure a commercial vehicular store to single storey residential dwelling; • Extension and modifications to existing structure with both internal and external elevation alterations; • General upgrade of the structure for habitable purposes including upgrading of the front existing vehicular entrance; • Upgrade private access to the rear of proposed dwelling located rear of the property known as The Coaches, Malahide Road, Swords, Co. Dublin AI Rcvd 05/10/2023 AI deemed Significant ** awaiting revised public notices SAI rcvd 16/10/2023 Submission 31/10/2023 ABP-318555-23 / 0.1 km away / 07 November 2023Granted
- F12A/0112The development will consist of: a single storey extension of 2,483 sq / 0.1 km away / 07 June 2012Granted
- F13A/0348Permission will consist of security railings 2.4 metres high to the no / 0.1 km away / 08 November 2013Granted
- F23A/0152Planning permission is being sought for the following / 0.1 km away / 01 June 2023Granted
- F12A/0034Amendments to previously approved development F11A/0104 / 0.1 km away / 10 April 2012Granted
- F11A/0104A single storey, part-two storey postal delivery service unit of 1,411 / 0.1 km away / 19 May 2011Granted