F11A/0001: The development will consist of the construction of a 169m² single sto
Gaelscoil An Duinnigh, Feltrim Road, Swords, Co. Dublin
DecisionGrant permission
Decided15 April 2011
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Gaelscoil An Duinnigh, Feltrim Road, Swords, Co. Dublin?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- F19A/0200Construction of an entrance porch and WC and the re-roofing of structu / 0.0 km away / 01 July 2019Granted
- F18A/0601Permission for the construction of a new three storey post primary sch / 0.1 km away / 12 December 2018Granted
- F21A/0032A temporary cafe/retail unit using a modified '20 foot' shipping container, with associated signage, external decking & seating area, bicycle parking, landscaping & site works to be used as a facility for serving to-go coffee and snacks. Add Info received 12th March 2021. / 0.1 km away / 08 April 2021Granted
- F10A/0481The construction of a new church complex on two levels of 1636 sq.m. i / 0.1 km away / 05 July 2011Granted
- F13A/0317A new timber shop front, signage and old style drop arm awnings to the / 0.1 km away / 21 October 2013Granted
- F16A/0272Works construction of a commercial unit for use as class 2(c) any othe / 0.2 km away / 11 August 2016Granted
- F24A/0132The development will consist of / 0.2 km away / 11 April 2024Granted
- F23A/0415Temporary permission sought for a period of five years at Malahide Portmarnock Educate Together Secondary School. The development will consist of the provision of 3 no. ballcourts; a pedestrian and cycle access route running from a new gated access at the north-west corner of the existing school grounds to the existing gate at the southern boundary of the adjoining public open space (adjoining the Waterside development) with associated boundary fencing and public lighting; surface water drainage (including attenuation tank, filter drains, surface water sewer, manhole and headway); and all associated site development works above and below ground. / 0.2 km away / 04 September 2023Granted