F11A/0095: Permission for development at this site (0.081 ha) to consist of amend
Building 970, The Charlestown Centre, St Margarets Road And, Charlesto
DecisionGrant permission
Decided17 May 2011
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- FW24A/0262EThe development will principally consist of: the provision of a 3.6 sq m extension along the northern elevation of the building to facilitate a new entrance lobby; opaque vinyl to windows along the western elevation; internal reconfiguration; and all associated site development works. / 0.1 km away / 30 July 2024Granted
- LRD0047/S3EThe proposed development will consist of 243no. residential units in 3no. Blocks (Blocks E, F and G) with a total gross floor area (GFA) of 22,116sq.m (excluding basement car parking) with associated ancillary accommodation, private balconies, communal amenity spaces and public open spaces as follows: Block E is an 8 storey building comprising 95no. apartments (24no. 1 bed units and 71no. 2 bed units; Block F is a 7 storey building comprising 81no. apartments (53no. 1 bed units and 28no. 2 bed units) and Block G is a 7 storey building comprising 67no. apartments (39no. 1 bed units and 28no. 2 bed units). A total of 108no. car parking spaces are provided in a combination of surface spaces and at basement level beneath Blocks E and F. The development will be accessed from Charlestown Place and via the adjoining Phase 1 development (Reg. Ref. ABP-310350-21) to the east which is currently under construction and modifications are proposed to the adjoining Phase 1 to provide for integration of Phases 1 and 2, including revised fire tender access for Phase 1 and basement access for Phase 2 west of the permitted Block C and east of the proposed Block E, access road and infrastructure connections between Phase 1 and 2 and bin store and bin staging point to the south east of the proposed Block G. The proposed Phase 2 development makes provision for access and infrastructure connections to the applicant's lands within the Dublin City Council administrative area to the west which will be subject of a separate future planning application. Permission is also sought for, hard and soft landscaping in public realm and public open spaces within the development, cycle parking at surface and basement levels, water supply and foul water connections and surface water infrastructure, connections to public utilities, ESB stations, plant areas, roof mounted photovoltaic (PV) panels and all associated site and development works. The application is a Large-Scale Residential Development and may be inspected at the following website: www.charlestownplacephase2lrd.com An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the proposed development. / 0.1 km away / 03 July 2025Granted
- F17A/0215This application seeks permission to complete and reconfigure the / 0.1 km away / 27 October 2017Granted
- F18A/0025Modifications to the recently permitted Phase 2B development (Reg. Ref / 0.1 km away / 16 March 2018Granted
- FW23A/0180The proposed development will consist of a high-power electric vehicle charging points and associated infrastructure consisting of the following: - Installation of 12 no. electric vehicle charging bays (11 no. Standard and 1 no. Accessible) replacing 14 no. existing car parking spaces, each comprising a parking space and electric vehicle charging unit on the western side of access road. - Associated revisions to existing car parking area on eastern side of access road consisting of a reduction of the 14 no. existing spaces to 13 no. existing spaces to 13 no. through the removal of 4 no existing car parking spaces and reconfiguration of the adjacent existing landscaped islands. - Installation of electric power units and wire mesh fencing. - Construction of a new modular substation building. - Relocation of existing parking payment terminal. - Installation of new zebra crossing road markings at existing crossing location at northern site application boundary. - All associated lighting, infrastructure and site development works. AI Rcvd 16/11/23 SAI received 28/11/23 / 0.1 km away / 14 December 2023Granted
- FW21A/0065Single storey service workshop extension (322m²) to rear of existing service workshop building. / 0.1 km away / 01 June 2021Granted
- F18A/0015Single storey vehicle showroom extension (267 sq.m.) to rear of existi / 0.1 km away / 12 March 2018Granted
- FW24A/0169Planning permission for single storey service workshop extension (589 sq mts) to rear of existing service workshop building at their existing premises. / 0.1 km away / 10 June 2024Granted