F11A/0472: Development at this 3.10 hectare site. The development will consist o
Townland Of Sandyhill, On The Eastern Side Of The R122, St Margarets,
DecisionRefuse permission
Decided22 February 2012
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Fingal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- F13A/03941) Replacing the existing septic tank with a new Biocycle waste water / 0.2 km away / 04 December 2013Refused
- F11A/0272Change of use of existing green waste storage building as granted unde / 0.5 km away / 05 September 2011Refused
- F13A/0101A two storey detached dwelling, shared entrance utilizing existing veh / 0.6 km away / 13 May 2013Refused
- FW20A/0120The proposed development will consist of a Petrol Fililng Station to include (i)A forecourt area with 4no. fuel pump islands, illuminated forecourt canopy over, 4 no. 40.000 litre underground fuel stroage tanks, associated pipework and overground fill points and overground fill points & vents, hcv pump and electric car charging points and associated infrastructure, (ii) A car wash area with 2 no.car wash boys associated underground water storage tanks, drainage and plant room, (iii) On- site facilities including,car services areas, car and bicycle parking, dedicated delievery lane, loading area pedestrian routes and associated line markings. (iv) Works to R122 including relocation of existing site access, formation of new access from R122, road widening and road markings. (v) Illuminated & non- illuminated operator signage including main ID Totem sign, canopy and facade signage, (vi) An amenity building of 626 sqm gross floor area which will include a convenience shop (100 sq.m net retail area) restaurant/café area with 2 no food offerings with hot and cold meals and refreshments for sale for consumption on and off the premises, associated drive thru facility, customer seating customer Wc's back of house area with food preparation areas, ancillary office, staff welfare facilities, storage and plant areas, ancillary off licence, (vii) Esb substation, (viii) Overground LPG tanks (ix) All site drainage works including rainwater harvesting, attenuation and foul treatment system, (x) All associated site lighting, landscaping, boundary treatments and site development works. AI received 17/05/21 AI deemed Significant Revised Public Notices Received 14/06/21 / 0.8 km away / 06 July 2021Refused
- F22A/0290Construction of a two storey dwelling, construction of a new vehicular entrance, installation of a proprietary wastewater treatment system with percolation area and all associated ancillary site works / 0.8 km away / 29 July 2022Refused
- FW25A/0343The developement consist / will consist of the following: 1. Retention permission is sought for: a) Extension to as-built Farm Shop (Reg. Ref. F15A/0564) consisting of cafe area of 34.24 sqm together with outdoor seating area. Works to facilitate this alteration were inclusive of internal amendments, changes to windows, doors and opes of the as-built development; and b) Alterations to car parking layout and access arrangements including the retention of 5 no additional car parking spaces (in addition to 25 no previously approved under F15A/0564). 2. Planning permission is sought for: a) Change of use from existing store to cafe seating area to southern end of existing building. b) A 215.53 sq. meter extension to existing Farm Shop and Cafe, together with outdoor seating area. The extended areas will consist of: i) Farm shop cold room and main store, kitchen and ancillary areas, lobby, cafe seating, plant rooms and bin store to the eastern side of existing building; ii) Meeting room, staff facilities, storage facilities and 1 additional female toilet in addition to existing toilet facilities to the western side of existing building; iii) New entrance lobby to the northern side of existing building. c) Associated signage for proposed development. d) PV solar panels to roof of building. e)Alterations and extension to the as-built car park and access arrangement to provide for an additional 10 no car parking spaces (inclusive of 3 no accessible spaces), together with 5 no motorcycle spaces, 20 no bicycle spaces and a delivery van set-down area. f) A designated EV charging hub and access road to the northern end of the site consisting of 8 no EV charging bays (inclusive of 1 no. accessible bay) in Phase 1 and 6 no. EV charging bays in Phase 2 of the development, together with ancillary equipment, ESB sub-station/switch room and accessible toilet facility. g) Decommissioning and removal of existing wastewater treatment system, new foul drainage connection via proposed pumping station to existing foul drainage system to the northern end of the development site adjacent to Food Central Road, surface water discharge via attenuation controlled outlet to adjoining drain on eastern side of site. h) All associated site works, landscaping, lighting and ancillary works necessary to facilitate the proposed development. i) Alterations to the hours of operation from 9.00am - 5.00pm Monday to Saturday, to 7.30am - 7. 00pm Monday to Friday and 8.00am - 7.00pm Saturday to Sunday. / 1.3 km away / 03 October 2025Refused
- FW24A/0253EThe proposed development will consist of: 1) the demolition of existing cattle pen and hard standing area (total 911m2) and the removal of 1 no. existing gated site entrance from the South Parallel Road (R108), and the construction of a westwards extension to the existing Holiday Blue Long-Term Car Park to provide an extended surface car park which will comprise 950 no. airport staff car parking spaces, of which 48 no. will be provided for Persons with Reduced Mobility (PRM) and 96 no. will be serviced by Electric Vehicle (EV) charging points, to be accessed off the South Parallel Road (R108) via an upgraded existing former temporary construction access/egress, with an emergency access also to be provided through the existing Holiday Blue Long-Term Car Park immediately east of the proposed development site via a tie in, with security barriers, to the existing internal roundabout; 2) 30 no. bicycle spaces; 3) 1 no. new bus shelter; 4) new internal road layout, with set down areas for buses and footpaths, incorporating 2 no. existing culverts (one of which is to be extended) and 1no. new culvert over the Santry River; 5) proposed riparian corridor either side of the Santry River; 6) 1 no. single-storey substation; 7) 1 no. new single storey welfare building; 8) 1 no. new single-storey security hut with security barriers; 9) new foul and surface water drainage system works incorporating attenuation; 10) the erection of CCTV equipment, security fencing, electrical enclosure, lighting, signage, and boundary fencing; and 11) all other associated site development works, including temporary construction compound, and all hard and soft landscaping. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and will be submitted to the planning authority with the application. / 1.3 km away / 08 August 2024Refused
- F16B/0251Amendments and modifications to previously approved planning permissio / 1.4 km away / 11 November 2016Refused