F12A/0006: A) Retention permission for reconfigured & relocated attenuation ponds
24Hr Filling Station, Staffordstown Business Park, Staffordstown, Turv
DecisionGrant permission for retention
Decided01 March 2012
Application typeRetention
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- F11A/0042Change of use and alteration to planning permission as previously gran / 0.0 km away / 01 April 2011Granted
- F16A/03482 Storey front extension of 114sq mtrs, 8.1m high to the existing dini / 0.0 km away / 05 October 2016Granted
- F13A/0212Additon of a fast food drive thru facility to our existing fast food o / 0.0 km away / 31 July 2013Granted
- F07A/1477/E1Site development works consisting of access roundabout forming junctio / 0.1 km away / 15 April 2013Granted
- F20A/00301. Change of use from warehouse storage to offices with ancillary storage; 2. Construction of a mezzanine floor (79.33 sq.m.) between Ground & First Floor levels for storage; 3. Partial infill of First Floor (73.50 sq.m.) to provide office space; 4. Construction of passenger lift, and 5. Amalgamation of two units. / 0.2 km away / 12 March 2020Granted
- F23A/0034The construction of 2 no. industrial/ warehousing units on an overall applicable site area of approx. 6.25ha. Unit A consists of an industrial building of approx. 9,555 sqm with 638 sqm of ancillary office and staff facility space, together with 82 no. car parking spaces and 72 no. cycle parking spaces. Overall height of approx. 18.3m. Unit B consists of an Industrial building of approx. 7,775 sqm with 824 sqm of ancillary office and staff facility space, together with 83 no. car parking spaces and 48 no. cycle parking spaces. Overall height of approx. 15.3m. Approximately 445m long, 7.5m-9m wide carriageway for the internal road layout to the future phase of Staffordstown Business Park and associated future industrial/commercial units (subject to separate planning application). A 1.5m footpath on both sides of the road (approximately 980m in length); and grass verges. The road, grass verges and footpath will extend to connect to the existing road constructed under Reg. Ref. F07A/1477. The site and access road levels will be raised and compensatory storage provided. The proposed development will also consist of a new watermain connection, proposed surface water drainage and foul sewer drainage connections and underground attenuation tank. Together with all ancillary drainage and site development works associated within the proposed development. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with this planning application. The planning application and NIS may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of Fingal County Council, Fingal County Hall, Main Street, Swords, Fingal, Co. Dublin, during its public opening hours. AI received 8/6/2023 AI deemed significant ** Revised Public Notices received 16/6/2023 / 0.2 km away / 10 August 2023Granted
- F21A/0146Continued operation of a WEEE facility for the reception, treatment and recovery of equipment within part (743.2 sqm) of an existing warehouse building (total area of 3.950 sqm), as authorised under planning grant F15A0496. / 0.2 km away / 07 May 2021Granted
- F15A/0496Change of use of c. 743.2 m² of existing warehouse (total size c. 3,95 / 0.2 km away / 23 March 2016Granted