F12A/0308: The development will consist of the construction of a dormer bungalow
West Curragh, Naul, Co Dublin
DecisionGrant permission
Decided07 January 2013
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- F14A/0122Retain the revised plans, the re-located dormer bungalow dwelling, det / 0.0 km away / 24 June 2014Granted
- F17A/0628Replace existing septic tank and percolation area with new secondary t / 0.0 km away / 04 December 2017Granted
- F17A/0584Modify an existing single vehicular entrance to accommodate two vehicu / 0.1 km away / 16 November 2017Granted
- F18A/0191Permission for 19 no. Polytunnels (7 No. Type A - 25.5m long x 8m wide / 0.3 km away / 07 June 2018Granted
- F13A/0043Side granny flat extension to existing dwelling including all associat / 0.6 km away / 02 April 2013Granted
- F25A/0374EThe development will consist of the installation of a 30 metres lattice telecommunications antennae support structure carrying antennas, dishes, remote radio units (RRU's), associated equipment, together with ground-based equipment cabinets, GPS, gantry poles, cable ladders, cable trays, fencing, concrete plinth, access track and all associated site development works for high-speed wireless data and broadband services. Additional Information Received 04/07/2025 / 0.7 km away / 30 July 2025Granted
- F12A/0188Part two storey, part single storey extension to rear of existing dwel / 1.0 km away / 08 August 2012Granted
- F24A/0080The development consists of: the construction of a new detached, two storey, three bedroom dwelling, and re-use of an existing site entrance, together with a new wastewater treatment system, percolation area and all associated siteworks. AI Rcvd 05/06/24 CAI received 09/07/24 SAI Rcvd 17/07/2024 / 1.0 km away / 06 August 2024Granted