F14A/0035: Retention and 10 year permission for 3 no single storey modular units
Swords Laboratories, South of Watery Lane, Swords, Co. Dublin.
DecisionGrant permission & grant retention
Decided14 January 2015
Application typePermission and Retention
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Swords Laboratories, South of Watery Lane, Swords, Co. Dublin.?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- F24A/0834ERetention permission for the continued use of 3 no. single storey modular units previously granted temporary permission and retention permission under ref- F14A/0035. The modular units comprise of 1 no. 54 sq.m unit comprising sanitary facilities, 1 no. 220 sq.m. unit for office use and 1 no. 250 sq.m. unit for office use and associated drainage and ground works at their site at Watery Lane, Swords, Co. Dublin. Retention permission is sought for a further 5-year temporary period. AI Rcvd - 6/12/2024 / 0.0 km away / 09 January 2025Granted
- F24A/0549Intends to apply for planning permission / 0.1 km away / 01 August 2024Granted
- F25A/0590Planning Permission to extend ground floor by 31.04 sq.m. to include 2 bedrooms, en-suite and bathroom. Raise external perimeter blockwork by 1.0 m and construct new 45 degree pitched roof to include 2 bedrooms and 2 en-suites plus all ancillary works within our site curtilage. / 0.1 km away / 21 August 2025Granted
- F19A/00251) The construction of a first floor extension on top of the existing / 0.1 km away / 19 March 2019Granted
- F18A/0089Permission for (a) Demolition of the derelict cottage known as 'Meadow / 0.1 km away / 20 June 2018Granted
- F16A/0325Retention permission for a vehicular entrance. / 0.1 km away / 13 September 2016Granted
- F16A/0116Sub-division of a 0.18 ha site and the erection of a new single storey / 0.1 km away / 23 June 2016Granted
- F20A/0457Permission for the construction of a standard 4MWe ESB substation and client-side switch room and associated works in support of the new power diversification. The development will consist of the construction of a standard ESB substation to standard ESB detail being 4x4.5x3 meters and cable arrangements with an adjoining client switch room of 6x2.5x3.6 meters, all finished in render blockwork, with standard galvanised ESB substation doors. / 0.1 km away / 09 November 2020Granted