F14A/0085: 1) Replacing the existing septic tank with a new Biocycle Wastewater t
Sandyhill, St. Margaret's, Co. Dublin.
DecisionGrant permission
Decided30 September 2014
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Sandyhill, St. Margaret's, Co. Dublin.?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- FW23A/0195Planning permission for development at lands at / 0.1 km away / 22 August 2023Granted
- F15A/0009A new playing surface circa 1766 sq.m. woth associated perimeter fenci / 0.3 km away / 10 March 2015Granted
- F13A/0141Retention of existing 15m monopole carrying associated antennae, assoc / 0.4 km away / 13 December 2013Granted
- F11A/0443The establishment of an authorised treatment facility for the de-pollu / 0.4 km away / 25 May 2012Granted
- FW20A/0029Retention planning permission and planning permission is sought by St. Margaret’s Recycling & Transfer Centre Ltd. at St. Margaret’s Metal Recycling, Sandyhill, St. Margaret’s, Co. Dublin. Retention planning permission is sought for the permanent continuation of use of the existing waste processing and transfer facility for the bulking, transfer and recycling of metals, construction & demolition waste, bulky/skip waste, batteries, wood waste, glass, other non-biodegradable non-hazardous wastes, and an Authorised Treatment Facility for end of life vehicles, accepting up to 24,900 tonnes of waste per annum. Retention permission is also sought for the continued use of the existing buildings on site associated with the daily operations of the facility including processing shed, offices, plant room, shelter buildings etc., existing site services, boundary treatments and all ancillary site development works necessary to facilitate the development erected under and in accordance with Reg. Ref’s. F13A/0409, F11A/0443, F10A/0177, F03A/1561, F03A/1682 and F97A/0109. Planning permission is sought for new proposed stormwater attenuation storage tanks and associated stormwater treatment infrastructure to serve the existing development with permission also sought to restore part of the lands to agricultural use. The above development will require a review of the existing waste facility permit for the site and as such, a separate application will be made to the environmental section of Fingal County Council upon receipt of planning permission. Add Info received 1st October 2020. Add Info deemed Significant 7th October 2020. Revised Public Notices received 13th October 2020. Clarification of Additional Information received 16.03.21 / 0.5 km away / 12 April 2021Granted
- F13A/04095 year permission for the continuation of use of a facility for the bu / 0.5 km away / 22 July 2014Granted
- FW21A/0240Retention permission for as constructed agricultural dairy milk pasturising shed, & Permission to complete the development works to include, new effluent treatment system, alter existing entrances and private access road, associated car parking, signage, and all associated site works for the purposes of an Agricultural Dairy Farm Shop. AI received 20/5/2022 / 0.5 km away / 07 June 2022Granted
- F21A/0364The construction of three new vehicle new vehicle accesses and agricultural gates at each site within daa ownership. Each access will be c.4 metres in width and will include a permeable hardstand area. Each proposed agricultural gate will be between 1.2 and 1.5 metres in height. The proposed development will also include the removal of an existing fence at location 3D and construction of a new timber and post perimeter fence c1.3m in height. The proposed development will also include all ancillary works including site excavation and development works above and below ground. / 0.6 km away / 26 August 2021Granted