F14A/0263: Change of use from commercial to commercial/part residential to accomm
281 Upper Main Street, Rush, Co. Dublin.
DecisionRefuse permission
Decided19 August 2014
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- F14A/0150Retention of replacement signage on the west elevation of existing off / 0.0 km away / 05 June 2014Refused
- F15A/0441Change of use of restaurant area at ground floor into new pizzeria tak / 0.0 km away / 11 November 2015Refused
- F19A/0294Permission for the constructiion of a single storey detached dwelling / 0.1 km away / 20 August 2019Refused
- F22A/0690Construction of a mixed use scheme comprising 21 No residential units (15 no. houses, 5 no duplexes and 1 no. apartment) and a community workhub facility, as follows: (a) construction of a two-storey residential block (Block A) comprising 4 no. two-bed duplex units (house Type 4); (b) construction of a three-storey mixed use block (Block B) comprising community workhub facility consisting of community workhubs, office, kitchenette, store, buggy store at ground floor level and 2 no. residential units 1 no two-bed duplex (House type 6) and 1 no. two-bed apartment (House type 5) at first and second floor levels (c) construction of 15 no. dwellings consisting of (i) 5 no. two-storey (with attic/dormer conversion) four-bed terraced dwellings (House type 3). Each residential unit will be provided with an area of private amenity space in the form of a private rear garden or terrace. Each unit will also be provided with solar PV panels at roof level; (d) construction of a single storey bin store to serve Block A apartments; (e) the scheme will be served by 46 no. car parking spaces to include 2 no. EV spaces; 2 no. disability spaces and 9 no. visitor spaces and 60 no. cycle parking spaces (including 30 no. to serve the dwellings; 20 to serve the apartments and community hub; and 10 no. to serve the public). Access to the scheme will be from Hand's Lane to the west (vehicular and pedestrian) and from Bollum Lane to the north (pedestrian only) and (f) all associated site and infrastructural works, including foul and surface water drainage; hard and soft landscaping, refuse stores, internal footpaths and road, lighting, signage and public open space necessary to facilitate the development / 0.2 km away / 15 February 2023Refused
- F12A/0205Retention of two illuminated signs projecting from the building at fir / 0.2 km away / 23 August 2012Refused
- F11A/0152Alterations to approved plans for a 2 storey detached dwelling (Planni / 0.2 km away / 09 June 2011Refused
- F12A/0356Construction of 4 no. two storey,3 bedroom terrace dwellings. The hou / 0.2 km away / 18 January 2013Refused
- F20A/0005Mixed-use development comprised of 74 no. residential dwellings and 2 no. retail/commercial units, on site measuring circa 2.1 hectares. The proposed development consists of 28 no. 2 storey 2, 3 & 4 bed semi-detached and terraced houses & 46 no. 1, 2 & 3 bed apartment and duplex units in 7 no. 2 & 3 storey blocks comprised of; (i) Block A: 2 no. retail/commercial units at ground floor level and 2 no. 1 & 2 bed apartments at first floor level, (ii) Block B: 2 no. 2 bed apartments at ground floor level and 2 No. 3 bed duplexes at first and second floor level, (iii) Block B1: 2 no. 2 bed apartments at ground floor level and 2 no. 3 bed duplexes at first and second floor level, (iv) Block C: 3 no. 2 bed apartments at ground floor level and 3 no. 3 bed duplexes at first and second floor level, (v) Block C1: 3 no. 2 bed apartments at ground floor level and 3 no. 3 bed duplexes at first and second floor level, (vi) Block D: 6 no. 2 bed apartments at ground floor level and 6 no. 3 bed duplexes at first and second floor level & (vii) Block D1: 6 no. 2 bed apartments at ground floor level and 6 no. 3 bed duplexes at first and second floor level. The proposed development includes for the demolition of an existing 1 storey dwelling (circa 116sq.m.). Access to the development will be via a new vehicular access point located off the Upper Main Street, Rush. The development also includes for all associated site developments works, ESB substation, drainage, services connections, car parking, pedestrian/cycle access, open spaces and landscaping etc. / 0.2 km away / 28 February 2020Refused