F16A/0580: The change of use of office space (permitted under Reg. Ref. F95A/0118
First Floor, Cooldriona Court, Swords, Co. Dublin.
DecisionRefuse permission
Decided16 February 2017
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- F21A/0444Permission for a 2.5m headframe extension to the existing 15 metre high telecommunications structure for the purposes of carrying antennae and communication dishes, along with ancillary lighting finial, (overall proposed height of main structure 17.5 metres) to be shared with multiple operators. / 0.1 km away / 13 October 2021Refused
- SHD/020/19To view details of this Strategic Housing Development please visit www.mainstreetswordsshd.com. ABP-306771-20 (i) Demolition of the existing 1-3 storey public house, restaurant and off-licence and associated storage buildings (totalling 1,197 sq.m. and removal of associated car park; (ii) Construction of a residential development providing a total of 172 no. residential apartments (comprising 67 no. one-bed units, 101 no. two-bed units and 4 no. two-bed units) in 4 no. four-seven storey blocks over basement. Each apartment has associated private open space in the form of a ground floor terrace or balcony and has access to 3 no. communal amenity spaces (totalling 296 sq.m.), including a communal gym (77 sq.m), and a ground floor level landscaped courtyard. The development is served by an underground carpark (accessed from Church Road) providing a total of 132 no. parking spaces (including 6 no. mobility impaired user parking space and 5 no. club car parking spaces), and 408 no. bicycle spaces (336 no. resident spaces at basement level and 72 no. visitor spaces at ground floor level in the central courtyard; (iii) 2 no. commercial units (comprising 394 sq.m. and 296 sq.m. and accommodating Class 1,2 and 8 uses as per the Planning & Development Regulations, 2001-2019, as amended); a c235 sq.m. creche and 87sq.m café at ground floor level; (iv) removal of existing culverts, installation of new culverts to facilitate pedestrian and vehicular access and diversion of the Glebe Stream on site; and (v) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary fences; plant areas; ESB substations; internal hard landscaping, including footpaths and street furniture; and all associated site development works. A Natura Impact Statement has been prepared in respect of the proposed development. Please note all submissions to be lodged with An Bord Pleanála, 64 Marlborough Street, Dublin 1 and must be accompanied by the prescribed fee of €20.00. / 0.1 km away / 28 July 2020Refused
- F15A/0442Demolition of no. 85 Main Street Swords to provide for access to tempo / 0.1 km away / 16 November 2015Refused
- F13A/0038Retention of temporary car park to rere. / 0.1 km away / 15 October 2013Refused
- F16A/0566Signage comprising window graphics to the front elevation / 0.1 km away / 09 February 2017Refused
- F19A/0527A new standalone, four-storey hotel (3,376.5 square metres), comprising 104 bedrooms and ancillary services, including day café, toilets, reception, foyer, administrative and staff facilities, etc., over a two-level basement car park (1,915 square metres), providing 52 no. car parking spaces, and all associated landscaping, site works and services. Permission is also being sought for demolition of an existing, two storey, pitched roof building within the site, a former builders' providers outlet. The site is bounded to the north by a protected structure, The Old Borough Schoolhouse, a Wetherspoon's Public House, and to the south by a Colortrend Paint outlet. The site is also bounded to the west by the Well Road. The proposed hotel will be built to 'Passive-House' standards of construction and energy conservation. Upon completion, this will be Ireland's first Passive-House certified hotel. / 0.1 km away / 10 January 2020Refused
- F18A/0428(1) The demolition of the existing site boundary wall and (2) the deve / 0.2 km away / 12 September 2018Refused
- F23A/0732Planning permission is sought for the construction of / 0.2 km away / 01 February 2024Refused