F17A/0409: Permission for development consisting of the construction of a 4-bedro
(Local Road L1190), Courtlough, Balbriggan, Co Dublin
DecisionGrant permission
Decided13 December 2017
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near (Local Road L1190), Courtlough, Balbriggan, Co Dublin?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- F17B/0055Retention for 1/ construction of ground floor kitchen extension, 2/ co / 0.2 km away / 10 May 2017Granted
- F24A/1119EA horse training facility comprising of a 20 horse stables barn with associated use including waste water treatment system and percolation area, gallops, barn for storage of fodder and machinery, horse walker, lunge ring, dungstead & soiled water tank, proposed entrance onto public road linking internal access laneway and all associated site works. Additional Information Received 25/04/2025 Clarification of Additional Information Received 07/10/2025 / 0.3 km away / 03 November 2025Granted
- F24A/0230The proposed development will comprise of: Alterations to previously approved development Reg. Ref. F21A/0211 comprising: (i) modifications to internal layouts at ground and first floor which will result in an increase in gross floor area by 357 sq.m.; (ii) extension to southern facade to provide toilets with external access; (iii) provision of outdoor permeable paved area to facilitate outdoor seating, retaining wall to south and west, and stairwell to entrance from car park; (iv) alterations to external material finish and fenestration to facades; Permission is also sought for (a) construction of a climbing frame to facilitate a high ropes course; and (b) all associated site works necessary to facilitate the development. AI Rcvd 15/10/2024 / 0.5 km away / 11 November 2024Granted
- F15A/0105Construction of a four bedroom dormer dwelling; single storey garage; / 0.5 km away / 06 May 2015Granted
- F17A/0440Development consisting of (i) alteration of site levels to create rais / 0.5 km away / 15 September 2017Granted
- F15A/0309Alterations to previously approved development Reg. Ref. F15A/0105 whi / 0.5 km away / 21 August 2015Granted
- F21A/0211(1) Construction of single storey changing facility (356m²) comprising reception area, WC, changing rooms (male and female), wet suit room, shower room, mechanical room and covered outdoor patio. (2) Construction of a 2-storey indoor activity centre (979m²) comprising open plan activity area, reception, cafe, seating area, WC, stairwell, and covered outdoor patio at ground floor level. First floor will comprise an office, 3 no. classrooms, and WC. (3) Provision of new 1-way vehicular entrance into the site from the Balrothery Road (LP01155). Vehicles will exit via the existing entrance onto the same road. (4) Provision of car parking comprising 42 no. car parking spaces and 3 no. mobility parking spaces and (5) SUDS drainage, foul treatment system, landscaping, boundary treatments and all associated works necessary to facilitate the development. AI received 30/11/21 / 0.5 km away / 04 January 2022Granted
- F25A/0713EPermission Consequent on the grant of Outline Permission (Register Reference No.: F21A/0591) is sought by Shaun Flynn, at Courtlough, Balbriggan, Co. Dublin. The development will consist of: (i) construction of 1 no. two storey four bedroom dwelling; (ii) new vehicular access from existing lane off L1155 Balrothery Road; and, (iii) all associated ancillary works necessary to facilitate the development including wastewater treatment system and percolation area, SUDS surface water drainage, site works, boundary treatments and landscaping. / 0.5 km away / 01 October 2025Granted