F17A/0426: Retention permission of an existing 21.8m high telecommunications stru
Ballymun Kickams GAA Club, Collinstown Lane, Cloghran, Co Dublin
DecisionGrant permission for retention
Decided07 September 2017
Application typeRetention
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballymun Kickams GAA Club, Collinstown Lane, Cloghran, Co Dublin?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- F12A/0011Retain an existing telecommunications installation consisting of a 20 / 0.0 km away / 09 March 2012Granted
- F12A/0269Replacement of existing septic tank and percolation area with a new do / 0.1 km away / 17 October 2012Granted
- F21A/0318The development consists of an existing telecommunications support structure (previously granted permission under Pl. Ref. F04A/0820) together with antennas, dishes, floodlights, for the GAA club, cabinets, fencing and all associated site development works. The development will continue to provide high speed wireless broadband and data services. / 0.1 km away / 28 July 2021Granted
- F15A/0212The erection of 3 number flagpoles, 2 number estate entrance signage, / 0.1 km away / 30 June 2015Granted
- F11A/0238Permission for an increase in on-site storage of Potassium Acetate (de / 0.2 km away / 08 August 2011Granted
- FW20A/0160Permission for temporary (12 months up to the end of 2021) change of use of 9.22 ha of existing Holiday Blue Car park for the development of a facility to provide for parking of Heavy Good Vehicles (HGV). The development comprises the reconfiguration of the existing car-parking area to provide 250 no. HGV parking spaces, as well as resurfacing of parking areas and internal roads. The development includes 10 no. prefabricated buildings comprising 2 no. 2.7m x 8.0m office units, 2 no. 2.7m x 8.0m canteen units, 4 no. 2.7 m x 5.0m bathroom units, 2 no. 2.7m x 6.0m shower units, proprietary waste-water treatment unit with percolation area, water connection to existing Irish Water service and ancillary works. / 0.5 km away / 18 November 2020Granted
- FW22A/0079The proposed development consists of the following at Site C: The construction of 1 no. light industrial/warehouse (including wholesale use) / logistics building (Unit C) with a gross floor area (GFA) of c. 6,627 sq.m (including welfare and reception areas over two levels and c. 216 sq.m of ancillary office space). The proposed building will have a maximum height of c. 15.2 metres. Provision of 58 no. car parking spaces and 14 no. bicycle parking spaces. Provision of an ESB substation and switchroom. Provision of a service yard and HGV loading/unloading areas, with associated loading bays to the west of the proposed light industrial/warehouse/logistics building. Provision of access arrangements to the proposed development including an access from the permitted roundabout to the southwest of the site, and from the main estate access road to the east of the site. The proposed development consists of the following at site E: The construction of 2 no. light industrial/warehouse (including wholesale use) / logistics buildings (Units E1 and E2) with a gross floor area of 12,578 sq.m and 11,457 sq.m. respectively (including welfare and reception areas over two levels for each building and ancillary office space of c. 565 sq.m. and c. 497 sq.m respectively). The proposed buildings will have a maximum height of c. 15.6 metres. Provision of 239 no. car parking spaces (125 no. for Unit E1 and 114 no. for Unit E2) and 76 no. bicycle parking spaces (38 no. for each unit). Provision of an ESB substation and switchroom, 2 no. sprinkler tanks and 2 no. pumprooms. Provision of service yards and HGV loading/unloading areas, with associated loading bays to the south of the proposed light industrial/warehouse/logistics buildings. Provision of access arrangements to the proposed development including accesses from the main estate access road to the north, and the provision of a new estate road along the eastern side of Unit E2, proceeding to the rear of both buildings and providing access to the service yards. The proposal includes landscaping and planting, 3 no. bin stores/recycling structures, PV panel zones at roof level, boundary treatments, signage zones, site lighting, security fencing and gates and all associated site services and development works, including underground foul and storm water drainage network and sustainable urban drainage systems (including the provision of an integrated construted wetland to the south of Site E). An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with this application. AI received 19/8/2022 / 0.6 km away / 10 October 2022Granted
- FW23A/0067The proposed development consists of the following: / 0.6 km away / 28 August 2023Granted