F17A/0705: The construction of a standard two room electrical substation to the r
Hawk House, Dublin Airport Logistics Park, St. Margaret's Road, St. Ma
DecisionGrant permission
Decided16 January 2018
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- F17A/0728The construction of a single storey unit for industrial and/or warehou / 0.1 km away / 26 January 2018Granted
- FW25A/0306EThe development consists of the material change of use from warehouse space to (a) a single storey climate controlled room (2,493m2), clean room (60m2) and office (42m2) to the warehouse area, cold store rooms to the mezzanine undercroft (187m2) comprising total gross floor area of 2,782m2, (b) two large tanks, one containing water servicing the sprinkler system (8.462m high/9.3m diameter) and one containing liquid nitrogen (8.15m high/3.57m diameter) and associated sprinkler pump room (35m2) to the rear service yard area and (c) all associated site works. AI Received 24th September 2025 Significant Additional information Received 14/10/2025 / 0.1 km away / 04 November 2025Granted
- F07A/0389/E1The development will consist of the construction of four single storey / 0.1 km away / 18 June 2012Granted
- F15A/0214External plant located in the rear service yard area of existing wareh / 0.1 km away / 02 July 2015Granted
- F16A/0040Amalgamation,alterations and Adjustments of Units 5 & 6 and constructi / 0.1 km away / 06 April 2016Granted
- FW24A/0018For planning permission for the following development at Unit 5/6 Cedar Drive, St Margarets, Coldwinters Dublin Airport Logistics Park, Co. Dublin, K67 E0C5. a) Construction of an open mezzanine floor at first floor level (587m2), b) Change of use from warehouse to office with the construction of 3no. internal office structrues with a total floor area of 121m2 to be located within the existing warehouse, c) New external single door to the north and south elevations, d) Illuminated high level external signage to the north and south elevations, and all associated siteworks. / 0.1 km away / 05 March 2024Granted
- F17A/0186Change of use of the second floor of Unit 5/6 granted under planning p / 0.1 km away / 24 May 2017Granted
- F18A/0053Installation of new railings to west elevation, north elevation and no / 0.1 km away / 16 March 2018Granted