F18A/0327: A new single storey 4-bedroom detached house, a detached domestic gara
Malheaney, Skerries, Co. Dublin.
DecisionGrant permission
Decided08 August 2018
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- F17B/0099A. Single storey extension to side B. All associated site works on bu / 0.0 km away / 09 June 2017Granted
- F25A/0479EPermission is sought for demolition of existing single storey flat roofed garage to side (29 sq. M.); and construction of single storey extension to the side and rear (85 sq. m.) of existing dwelling; and all associated site works at Malheney, Skerries, Co. Dublin, K34 VR92. Additional Information received 25/09/2025 / 0.0 km away / 17 October 2025Granted
- F18A/0295A new replacement domestic wastewater treatment plant and all associte / 0.0 km away / 19 July 2018Granted
- F20B/0156The construction of a detached gym and storage room to the rear of the current property. / 0.1 km away / 03 September 2020Granted
- F16B/0157Single storey extension to the front (south elevation) and side (east / 0.1 km away / 09 August 2016Granted
- F20A/0400Retention permission for a single storey conservatory to side of dwelling, 2 no. detached single storey garages to front and waste water treatment system. / 0.1 km away / 07 October 2020Granted
- F22A/0677Alterations and extensions to an existing single storey bungalow at this site address: Palmerstown, Skerries, Co. Dublin, K34 E179. The proposed development will consist of the following: 1) demolition of existing boiler house (4.0 sq/m) to rear of dwelling, 2) new single storey extension to front/side of dwelling (15 Sq/m) incorporating a new Velux rooflight to the east elevation, 3) new entrance porch to side (2.5 Sq/m), 4) new single storey extension to rear/side of dwelling (75 Sq/m) - total additional floor area -92.5 sq/m, 5) internal alterations to existing dwelling layout, 6) decommissioning of existing septic tank and installation of a new onsite wastewater treatment plant and percolation area 7) new timber fence to east boundary of site and 8) new onsite surface water disposal soakpits and all associated site development works. / 0.2 km away / 08 February 2023Granted
- F24A/0599ECWPA Planning and Architecture, North Street Business Park, Unit 10, Seatown West, Balheary Demesne, Swords, Co. Dublin, K67 C992, have been retained by our Client, Ms. Dearbhla Sheridan, Malheney, Skerries, Co. Dublin, K34 FK35, to prepare this planning application for alterations and extensions to an existing cottage (c. 35 m2 GFA) together with a new proprietary on-site Waste Water Treatment Plant (WWTP) at Malheney, Skerries, Co. Dublin, K34 X036. The proposed development consists of the following; a) New lime render finish to all external walls of existing cottage. b) Replacement of existing windows with new painted timber sliding sash windows to front elevation of existing cottage and the replacement of existing door at front elevation with fixed painted timber door and frame. c) Provision of new slated roof finish to existing cottage. d) Construction of new single storey rear and side extension (c. 108.4 m2 GFA) to existing cottage with self-finish render externally and selected standing seam zinc and flat membrane roof finish. e) Provision of new patio area to the rear of existing proposed extension. f) Installation of new on- site wastewater treatment plant and percolation area. g) Proposed new 1.2 m high timber post and rail fence to east and west boundaries and revisions to existing front entrance and front boundary treatment. h) Installation of new on - site surface water disposal soakpits and all associated site development works. / 0.2 km away / 23 August 2024Granted