Gaelscoil ROS Eo, Aras Naomh Maur, Kenure Park, Rush, Co. Dublin.
Planning application F19A/0134
DecisionGrant permission
Decided14 January 2020
Application typePermission
Source documents11
Site
What is on file
0refusal reasons6conditions8nearby records
Proposed development
Application description published by Fingal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development must be carried out in accordance with lodged plans, particulars and specifications.Compliance
- 2Temporary permission expires 3 years from final grant unless retention permission is granted.Occupancy
- 3Structure must be removed within 3 years and 1 month of final grant unless retention permission is granted.Occupancy
- 4Foul and surface water layouts must accord with Drawing CL 1896-03. Foul drainage must comply with EPA Code of Practice (Oct 2009). Surface water must comply with Greater Dublin Regional Code of Practice for Drainage Works v6.0 (Apr 2006). Systems must remain separate.Wastewater Drainage
- 5Contractor must prevent spillage/deposit on adjoining roads and bear full repair costs for any road damage.Construction Management
- 6Construction hours restricted to 8am-7pm Mon-Fri and 8am-1pm Sat. No work on Sundays or Bank Holidays.Construction Management
Planning a project near Gaelscoil ROS Eo, Aras Naomh Maur, Kenure Park, Rush, Co. Dublin.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 49 pages of searchable text on file.Included in site brief
11 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 10 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
11 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- F19A/0520Retention for 4 No. temporary pre-fabricated structures which have exp / 0.0 km away / 18 December 2019Granted
- F12A/0084Retention permission for development (a) and permission for developmen / 0.0 km away / 20 September 2012Granted
- F15A/03562 storey, 2 classroom pre-fabricated temporary structure / 0.0 km away / 23 November 2015Granted
- F11A/0014New 6 m high x 20m long concrete hurling / ball wall with double sided / 0.0 km away / 04 January 2012Granted
- F16A/0512Retention of existing boundaries to east and south of the existing det / 0.1 km away / 18 January 2017Granted
- F17A/0090The provision of A) 2 no. sets of ball catchments nets on steel posts / 0.1 km away / 11 April 2017Granted
- F18A/0064Provision of an All-weather pitch / 0.1 km away / 06 April 2018Granted
- F21A/0637Provision of A) New flood lighting on 18m high steel posts around / 0.2 km away / 28 January 2022Granted