GrantedDecided 15 July 2020Fingal County Council

Harbour Road, Rush, Co Dublin

Planning application F19A/0270
DecisionGrant outline permission
Decided15 July 2020
Application typeOutline Permission
Source documents15

Site

What is on file

0refusal reasons11conditions8nearby records

Proposed development

Application description published by Fingal County Council.
Outline planning permissionis sought for development consisting of the

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Development to be carried out in accordance with submitted plans and additional information.Compliance
  • 2Outline permission relates to single storey dwelling with monopitch roof as submitted.Design Materials
  • 3Siting and layout to accord with site layout plan Drawing No.19011-PL-03 received 20 May 2020.Design Materials
  • 4Plans for dwelling to be submitted with details on design, layout, driveways, drainage, external finishes; height not to exceed 5.65m; floor area max 155 sqm; front elevation north facing; roof finished with blue or black slate/tiles; western boundary 1.8m timber post and rail fencing; landscape plan required.Design Materials
  • 5Surface water drainage to comply with BRE Digest 365, GDSDS, and Greater Dublin Regional Code of Practice; no discharge to foul sewer.Wastewater Drainage
  • 6Water and wastewater connection agreements with Irish Water required prior to commencement; development to comply with Irish Water standards; no impact on foul sewer access; proposals to build over/divert services require Irish Water approval; separation distances per Irish Water codes.Water Services
  • 7No objects or landscaping over 0.9m in visibility triangle; stormwater to soakpits on site; works at applicant's expense.Traffic Access
  • 8Contractor to prevent spillage of debris on roads; applicant responsible for repair of any damage to public roads caused by construction.Construction Management
  • 9Construction hours restricted to 8am-7pm Mon-Fri, 8am-2pm Sat; no work on Sundays or Bank Holidays.Construction Management
  • 10Bathroom/en suite windows to be fitted with obscure glass permanently; film not acceptable.Design Materials
  • 11All public services including electrical and telephone cables to be located underground throughout the site.Other

Planning a project near Harbour Road, Rush, Co Dublin?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.

Inside the decision file

Extracts from the council's own decision documents for this application — 65 pages of searchable text on file.

15 council documents — in the €39 site risk brief

Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 11 documents.

Source documents

Original council portal records and source PDFs where available.

15 council documents — in the €39 site risk brief

Site brief

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →