GrantedDecided 02 January 2020Fingal County Council

F19A/0283: The development will consist of the following: (1) The change of use of existing 2-storey office building to medical clinical use, consisting of consulting rooms, ultrasound rooms, research & analysis facilities, treatment rooms, counselling & wellbeing facilities, administrative offices and staff facilities; (2) Additional mezzanine floor area (129m²) at first floor level; (3) The installation of an emergency exit door to the northeast elevation; (4) The construction of 3 new rooflights to the existing roof; (5) The construction of a new single storey building for storage purposes in the adjacent existing landscaped area to the southeast; (6) Modifications to the existing road layout and set down area to provide 3 additional disabled car parking spaces; (7) All associated ancillary works. Add Info received 3rd December 2019.

Unit 5/6A, Swords Business Campus, Balheary Road, Balheary Demesne, Sw
DecisionGrant permission
Decided02 January 2020
Application typePermission
Source documents14

Site

What is on file

0refusal reasons11conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Fingal is in progress.

Conditions

  • 1Development must be carried out in accordance with plans lodged 3 July 2019 and additional information received 3 December 2019.Compliance
  • 222 car parking spaces provided. Bicycle parking must be covered/sheltered and agreed in writing. Parking Management Strategy Report and layout plan required for written approval prior to construction.Traffic Access
  • 3No surface water/rainwater to discharge into foul water system. Surface water drainage must comply with Greater Dublin Regional Code of Practice for Drainage Works, Version 6.0, FCC, April 2006.Wastewater Drainage
  • 4Applicant must sign a connection agreement with Irish Water prior to commencement and adhere to its standards.Water Services
  • 5Boundary trees and Ward River must be protected from damage. Planting/replanting in first planting season. Dead/damaged trees replaced within next planting season.Landscaping Boundary
  • 6Sufficient artificial lighting and ventilation provided. Suitable storage for waste bins, food waste, and segregation/disposal of sharps and medical waste per HSE Waste Management Awareness Handbook 2011.Compliance
  • 7External finishes of the proposed storage area must harmonise in colour and texture with the existing premises.Design Materials
  • 8Prevent spillage/deposit of debris on adjoining roads. Developer responsible for full cost of repair to adjoining public road.Construction Management
  • 9All public services, including electrical and telephone cables, must be located underground throughout the entire site.Design Materials
  • 10Construction machinery hours restricted to 08:00-19:00 Mon-Fri and 08:00-13:00 Sat. Dust and noise controls required. Operational noise shall not exceed NG4 limits.Construction Management
  • 11Developer shall pay €16,335 (updated at commencement) as a contribution towards public infrastructure and facilities benefiting development in the area.Development Contribution

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.