Bawn Road, Rush, Co Dublin
Planning application F19A/0407
DecisionGrant permission
Decided15 January 2020
Application typePermission
Source documents11
Site
What is on file
0refusal reasons13conditions8nearby records
Proposed development
Application description published by Fingal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development must be carried out in accordance with lodged plans and additional information received 12 Dec 2019.Compliance
- 2Site to be used solely as a single dwelling unit.Other
- 3External finishes per Drawing 19PL-002: neutral render walls; blue/black/slate grey slates or metal roof.Design Materials
- 4Bathroom/en-suite windows must use permanently fixed obscure glass; film not acceptable.Design Materials
- 5Foul and surface water layouts must accord with Hydrocare Environmental Ltd. reports. No surface water to foul sewer. Surface water drainage per GDRCPD V6.0.Wastewater Drainage
- 6Water/wastewater connection agreement with Irish Water required prior to commencement.Water Services
- 7Front boundary walls ≤0.9m; visibility triangle clear to 0.9m; no gate over footpath; kerb dished; access gradient ≤2.5% over last 6m; stormwater retained on site; services relocated at developer's expense.Traffic Access
- 8Garage incidental to main dwelling; no independent sale, rental, trade, or habitation.Other
- 9All public services (electrical, telephone, etc.) to be located underground across the site.Other
- 10House not to be occupied until all services connected and operational.Occupancy
- 11Construction hours restricted to 8am-7pm Mon-Fri, 8am-2pm Sat. No work Sundays or Bank Holidays.Construction Management
- 12Contractor must prevent road spillage and bear full cost of road repairs from construction works.Construction Management
Planning a project near Bawn Road, Rush, Co Dublin?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 54 pages of searchable text on file.Included in site brief
11 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 10 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
11 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- F11B/0110Retention of existing porch extension to front, and existing conservat / 0.0 km away / 05 July 2011Granted
- F17B/0047(a) Demolition of existing porch to front, existing 2 storey return & / 0.1 km away / 03 May 2017Granted
- F16A/0601Construct a new 4 bedroom dwelling with new vehicle entrance, ancillar / 0.1 km away / 22 February 2017Granted
- F19A/0475Permission for change of use from commercial premises to residential d / 0.1 km away / 02 December 2019Granted
- F16A/0600Construct a new 4 bedroom dwelling with new vehicle entrance, ancillar / 0.1 km away / 22 February 2017Granted
- F20B/0312Demolition of existing two storey extension to rear; construction of n / 0.1 km away / 03 February 2021Granted
- F12B/0139New single storey extension to rear of existing detached 2-storey dwel / 0.1 km away / 12 September 2012Granted
- F11A/0021(A) Retention permission for (i) Change of use from beauty salon to co / 0.1 km away / 15 August 2011Granted