F19A/0422: For a new two-storey detached dormer bungalow dwelling. The development that will consist of (a) A new detached dormer bungalow (b) New proprietary wastewater treatment system (c) A new vehicular entrance and (d) All associated site works. Add Info received 16th December 2019.
Quay Road, Portrane, Co Dublin
DecisionGrant permission
Decided16 January 2020
Application typePermission
Source documents14
Site
What is on file
0refusal reasons12conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
- 1Development to be carried out in entirety in accordance with plans/specs lodged 10 Sep 2019 and additional information received 16 Dec 2019.Compliance
- 2Road safety requirements: visibility triangle <900mm; hedgerow removal for 45m sightlines from entrance; works completed prior to construction; services relocated at developer's expense; access gradient ≤2.5% over last 6m; stormwater disposed into soakpits/drains within site; all works at applicant's expense.Traffic Access
- 3Surface water drainage: no discharge into foul system; compliance with Greater Dublin Regional Code of Practice for Drainage Works v6.0.Wastewater Drainage
- 4Foul sewer drainage: no discharge into surface water system; compliance with Regional Code of Practice v6.0 or EPA Code of Practice for Wastewater Treatment (Oct 2009).Wastewater Drainage
- 5Applicant must sign Irish Water connection agreement prior to commencement and adhere to its standards/conditions.Water Services
- 6Escallonia, Olearia or similar hedge planted inside proposed front boundary wall in first planting season post-construction. All walls/piers finished with Howth stone or similar.Landscaping Boundary
- 7Dwelling to be used as a single dwelling unit apart from exempted development.Occupancy
- 8Use restricted to applicant and/or immediate family for minimum 7 years from occupancy date. Mortgagee sale consent permitted.Occupancy
- 9Contractor to prevent spillage/deposit of debris on adjoining roads; applicant/developer responsible for full cost of road repair.Construction Management
- 10All public services (electrical, telephone, associated equipment) to be located underground throughout the entire site.Other
- 11Construction hours restricted to 0800-1900 Mon-Fri, 0800-1400 Sat; no work Sun/Bank Holidays; no deliveries before 0800 or after 1900; no annoying activity 1900-0800.Construction Management
- 12Payment of €19,642.00 (updated per Tender Price Index at commencement) to Planning Authority for public infrastructure/facilities prior to commencement. Phasing to be agreed in writing.Development Contribution
Planning a project near Quay Road, Portrane, Co Dublin?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / 6E633CC4FF1811E9B0D53464A927EB6F.tif / Document 646529Source PDF
- Notification Of DecisionSource: planningapi.agileapplications.ie / 45514E35387511EA8DBC3464A927EB6F.tif / Document 671610Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / 6E633CC7FF1811E9B0D53464A927EB6F.tif / Document 653019Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / 45514E38387511EA8DBC3464A927EB6F.tif / Document 693286Source PDF
- Final GrantSource: planningapi.agileapplications.ie / 1551107357D111EA8A51AC220B76673F.tif / Document 685267Source PDF
- Planners ReportSource: planningapi.agileapplications.ie / 0E63722A008C11EAB0D53464A927EB6F.tif / Document 638184Source PDF
- Planners ReportSource: planningapi.agileapplications.ie / 0E637227008C11EAB0D53464A927EB6F.tif / Document 638368Source PDF
- ReportsSource: planningapi.agileapplications.ie / 4C8CA899EF4811E99C065404A66C062E.pdf / Document 644119Source PDF
- ReportsSource: planningapi.agileapplications.ie / 9CC6542EFFC611E9B37D3464A927E8C3.docx / Document 649147Source PDF
- ReportsSource: planningapi.agileapplications.ie / B40F3074EAAA11E9AD383464A9277F10.docx / Document 650194Source PDF
- ReportsSource: planningapi.agileapplications.ie / C536A6E7DBB711E985E4005056926A5C.pdf / Document 657635Source PDF
- ReportsSource: planningapi.agileapplications.ie / DE2BA14D09F111EAAEB53464A9277F10.docx / Document 659353Source PDF
- ReportsSource: planningapi.agileapplications.ie / 48034D6836C711EABA703464A930CE3B.pdf / Document 693377Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- F24A/1064E(a) Revisions to front/ east elevation including revised fenestration, 1 no. new zinc dormer window, relocation of balcony at first floor level and removal of 1 no. rooflight. (b) Revisions to front/ east elevation consisting of partial elevational setback to facilitate relocated balcony. c) Revisions to rear/ west elevation consisting of the removal of partial elevational setback and relocation of 1 no. rooflight. d) Revisions to side/ south elevation consisting of removal of 1 no. rooflight. e) Revisions to side/ north elevation consisting of removal of 1 no. rooflight, the replacement of 1 no. door with 1 no. new window and provision of render finish at ground floor level. f) Revisions to internal layout of the approved residential dwelling at ground and first floor level. e) The proposed amendments will see a minor reduction in GFA from c. 235 m2 to c. 233 m2. AI received 06/02/2025 / 0.0 km away / 03 March 2025Granted
- F24A/0153The proposed development consists of the following: The construction of a new part single storey, part 1 1/2 storey, 3 no. bedroom detached residential dwelling (c. 235 m2 GFA), provision of new front boundary treatment, new vehicular site entrance and access driveway together with 2 no. within curtilage car parking spaces to serve the proposed dwelling, the installation of new proprietary on-site Waste Water Treatment Plant (WWTP) and all associated site works necessary to facilitate the development. AI Rcvd 30/05/24 / 0.0 km away / 25 June 2024Granted
- F13B/0187Alterations to the existing house: To East: Removal of three existing / 0.0 km away / 13 January 2014Granted
- F12A/0292Alterations to previously approved F10A/0394, alterations to existing / 0.1 km away / 07 November 2012Granted
- F17A/0775The amalgamation of 3 & 4 Coast Guard House into 1 no. two-storey, 5-b / 0.2 km away / 23 February 2018Granted
- F11B/0247Expand the original extension to the rear of the property with a singl / 0.3 km away / 31 January 2012Granted
- F21B/0212Single-storey extension to the existing west elevation, / 0.3 km away / 23 July 2021Granted
- F18B/0263Retention Planning Permission for single storey extension to side of e / 0.3 km away / 09 November 2018Granted