GrantedDecided 14 January 2020Fingal County Council

Kenure Demesne, Rush, County Dublin, K56 F973

Planning application F19A/0548
DecisionGrant permission
Decided14 January 2020
Application typePermission
Source documents7

Site

What is on file

0refusal reasons11conditions8nearby records

Proposed development

Application description published by Fingal County Council.
For a dormer cottage with a proposed total floor area of 230 sqm.The w

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Development to be carried out in accordance with plans lodged 19 Nov 2019.Compliance
  • 2Premises restricted to single dwelling unit use.Compliance
  • 3Occupancy restricted to applicant/immediate family for minimum 7 years from date of occupancy.Occupancy
  • 4External finishes per Drawing D1510A2-P02: neutral colour render for walls; blue, black or slate grey slates for roof.Design Materials
  • 5Bathroom/en-suite windows to have permanently maintained obscure glass; film not acceptable.Design Materials
  • 6Foul drainage separation from surface water; compliance with Greater Dublin Regional Code of Practice / EPA Code of Practice. Min 40m separation between well and WWTP; certification of water adequacy/potability prior to commencement.Wastewater Drainage
  • 7Front boundary set 4m back from road centre; visibility triangle clear; entry-splay in bound material; storm water disposed on-site; services relocated at developer's expense.Traffic Access
  • 8All public services (electrical, telephone) to be located underground throughout the entire site.Design Materials
  • 9Construction hours restricted to 8am-7pm Mon-Fri, 8am-2pm Sat; no work on Sundays or Bank Holidays.Construction Management
  • 10Contractor to prevent spillage on adjoining roads; responsible for full cost of road repair.Construction Management
  • 11Payment of €23,963 (updated per Tender Price Index) for public infrastructure, phasing agreed in writing prior to commencement.Development Contribution

Planning a project near Kenure Demesne, Rush, County Dublin, K56 F973?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.

Inside the decision file

Extracts from the council's own decision documents for this application — 55 pages of searchable text on file.

7 council documents — in the €39 site risk brief

Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 6 documents.

Source documents

Original council portal records and source PDFs where available.

7 council documents — in the €39 site risk brief

Site brief

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →