GrantedDecided 24 January 2020Fingal County Council

F19B/0111: Part single and part two storey extension, both with flat roof, to rear of existing dwelling; replacement of existing velux roof lights with a box dormer to existing second floor loft on the rear roof hip; replacement of existing gable dormer with a box dormer to existing second floor loft on the front roof hip, internal alterations and associated elevation changes, landscaping and ancillary site works. Add Info received 30th December 2019.

91 Dublin Road, Sutton, Dublin 13, D13 H970
DecisionGrant permission
Decided24 January 2020
Application typePermission
Source documents14

Site

What is on file

0refusal reasons9conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Fingal is in progress.

Conditions

  • 1Development to be carried out in accordance with lodged plans, specifications, and additional information received 30 Dec 2019.Compliance
  • 2Amended by ABP. Dormer max width 3m, glazing max width 2m, set min 300mm below ridge. First floor extension max width 6m. Glazed area/height per drawing 1904-P-103 Rev A. Revised drawings to be agreed prior to commencement.Design Materials
  • 3All external materials to harmonise in colour and texture with the existing dwelling.Design Materials
  • 4Premises to be used solely as a single dwelling unit.Occupancy
  • 5Surface water drainage design per SuDS/GDSDS. Soakaway per BRE 365. No surface water to discharge into foul system.Wastewater Drainage
  • 6Foul drainage compliance with Regional Code of Practice/EPA Code. No foul drainage to discharge into surface water system.Wastewater Drainage
  • 7Prevent spillage/debris on adjoining roads during construction. Developer responsible for full repair costs.Construction Management
  • 8Construction hours restricted to 8am-7pm Mon-Fri, 8am-2pm Sat. No work on Sundays or Bank Holidays.Construction Management
  • 9Payment of €1,670 planning contribution to the Planning Authority prior to commencement, subject to Tender Price Index updates.Development Contribution

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.