F19B/0293: New porch way to the side of the existing house, a new extended kitchen / living area at the ground floor level to the rear of the existing house, new roof over the existing converted garage, attic conversion including dormer windows and associated works.
101 Ard Na Mara, Malahide, Co. Dublin
DecisionGrant permission
Decided13 January 2020
Application typePermission
Source documents5
Site
What is on file
0refusal reasons8conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
- 1Development must be carried out in accordance with lodged plans, particulars, and specifications.Compliance
- 2Pitched roof profile over converted garage to be omitted; flat roof profile to be retained to maintain visual balance.Other
- 3All external finishes must harmonise in colour and texture with the existing dwelling.Design Materials
- 4Premises to be used solely as a single dwelling unit.Occupancy
- 5Submit surface water drainage proposal following SuDS principles and GDSDS policies prior to commencement. No surface water to discharge into foul system. Must comply with Greater Dublin Regional Code of Practice for Drainage Works.Wastewater Drainage
- 6Measures to prevent spillage of materials on adjoining roads; developer responsible for full cost of repair for any damage to public road.Construction Management
- 7Construction hours restricted to 8am-7pm Mon-Fri and 8am-2pm Sat. No work on Sundays or Bank Holidays.Construction Management
- 8Pay €1,080 (updated at commencement date per Tender Price Index) to Planning Authority for public infrastructure and facilities. Phasing to be agreed in writing prior to commencement.Development Contribution
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / B70678B536DE11EA99D33464A927EB6F.tif / Document 683444Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / B70678B836DE11EA99D33464A927EB6F.tif / Document 684497Source PDF
- Final GrantSource: planningapi.agileapplications.ie / D68B403A53F411EAA74E3464A927E5D1.pdf / Document 698483Source PDF
- Planners ReportSource: planningapi.agileapplications.ie / 37226F7E37A811EA99D33464A927EB6F.tif / Document 670524Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- F21B/0377The construction of 2 no. dormer windows to the north side of the existing pitched roof and minor alterations. / 0.0 km away / 19 January 2022Granted
- F18A/0713A) A proposed new dormer widnow and increading the size of the existin / 0.0 km away / 11 February 2019Granted
- F25A/1053EThe development will consist of the construction of a new garden shed and gym located in the back garden and all associated site works. / 0.0 km away / 12 January 2026Granted
- F21A/0305Demolition of the conservatory to the rear and construction of an extension to the rear, conversion of the garage and attic space, including 2 dormer windows, the widening of the vehicle access and all necessary site works. / 0.0 km away / 13 July 2021Granted
- F17A/0121The demolition of the existing garage, WC, store and shed to the north / 0.1 km away / 24 April 2017Granted
- F14B/0216Remodel existing attic area with new dormer to side of apex roof and m / 0.1 km away / 16 October 2014Granted
- F24A/0438EThe development consists of Permission for demolition of ancillary structures to the side and rear, new first floor window to the front, widening of existing dormer at first floor level to the North side, conversion of existing shed to use as utility room and shed, new thermal upgrades including external insulation, roof insulation, 2 no. new rooflights and all associated site works to the existing dwelling / 0.1 km away / 01 July 2024Granted
- F24A/0216The development consists of / 0.1 km away / 29 April 2024Granted