GrantedDecided 10 March 2020Fingal County Council

Thomastown, Loughshinny, Co. Dublin.

Planning application F20A/0021
DecisionGrant permission
Decided10 March 2020
Application typePermission
Source documents8

Site

What is on file

0refusal reasons13conditions8nearby records

Proposed development

Application description published by Fingal County Council.
Permission for A) Two storey dormer bungalow, B) Associated off street

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Development must be carried out in entirety in accordance with lodged plans, particulars, and specifications.Compliance
  • 2External finishes restricted to neutral coloured render and brick (red/buff) with roof slate/tile (blue/black) unless otherwise agreed in writing prior to commencement.Design Materials
  • 3Soakaway details, size, and site-specific infiltration test results (with dates/times/photos) to be agreed prior to commencement. Must comply with BRE Digest 365, GDSDS, 30-year critical duration storm event with climate change. Minimum 5m from structure, 3m from boundary. No surface water to foul sewer. Compliance with Greater Dublin Regional Code of Practice for Drainage Works Version 6.0.Wastewater Drainage
  • 4Water and/or wastewater connection agreement(s) with Irish Water required prior to commencement.Water Services
  • 5Vehicular entry-splay in bound road material. Visibility triangles clear to 0.9m. Stormwater disposed on-site. Footpath/kerb dished. All works prior to occupation. No gate across public footpath/road.Traffic Access
  • 6Residential unit not to be occupied until all services connected and operational.Occupancy
  • 7Property to be used as a single dwelling unit only, apart from exempted development.Compliance
  • 8Bathroom/en-suite windows to be fitted and permanently maintained with obscure glass. Film not acceptable.Design Materials
  • 9Measures to prevent spillage/deposit of materials on adjoining roads. Applicant responsible for full cost of repair for any damage to public road.Construction Management
  • 10All public services (electrical, telephone, etc.) to be located underground throughout the site.Other
  • 11Construction hours restricted to Mon-Fri 8am-7pm, Sat 8am-2pm. No work on Sundays or Bank Holidays.Construction Management
  • 12Developer to enter into Section 96 agreement with Planning Authority for Part V housing requirements, or obtain Section 97 Exemption Certificate, prior to commencement.Compliance

Planning a project near Thomastown, Loughshinny, Co. Dublin.?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.

Inside the decision file

Extracts from the council's own decision documents for this application — 34 pages of searchable text on file.

8 council documents — in the €39 site risk brief

Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 7 documents.

Source documents

Original council portal records and source PDFs where available.

8 council documents — in the €39 site risk brief

Site brief

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →