Boroimhe Shopping Centre, Boroimhe, Swords, Co. Dublin.
Planning application F20A/0066
DecisionGrant permission
Decided02 April 2020
Application typePermission
Source documents10
Site
What is on file
0refusal reasons9conditions8nearby records
Proposed development
Application description published by Fingal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development must be carried out in accordance with lodged plans, particulars and specifications.Compliance
- 2Shop unit use restricted to Class 1 'use as a shop' under Planning and Development Regulations 2001.Occupancy
- 3Shopfront signage details to be submitted for written agreement prior to commencement. No signage in front window.Design Materials
- 4No surface water/rainwater to discharge into foul sewer. Surface water drainage must comply with Greater Dublin Regional Code of Practice for Drainage Works Version 6.0.Wastewater Drainage
- 5Contractor must prevent spillage/debris on adjoining roads. Developer responsible for full cost of repair for any damage to public road.Construction Management
- 6All public services (electrical, telephone cables, equipment) must be located underground throughout the entire site.Compliance
- 7Construction hours restricted to 8.00am-7.00pm Mon-Fri and 8.00am-2.00pm Sat. No work on Sundays or Bank Holidays.Construction Management
- 8Construction noise, dust, and mechanical services must comply with Environmental Health Officer requirements. Noise limits: Daytime 55dB, Evening 50dB, Night 45dB. No malodours or vibration nuisance.Environment Ecology
- 9Developer must pay €4,870 (updated per Tender Price Index) to Planning Authority for public infrastructure/facilities prior to commencement.Development Contribution
Planning a project near Boroimhe Shopping Centre, Boroimhe, Swords, Co. Dublin.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 37 pages of searchable text on file.Included in site brief
10 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 9 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
10 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- F20A/0136The change of use from offices to healthcare use for the 1st floor off / 0.0 km away / 18 September 2020Granted
- F19A/0151Alterations to the elevations of the proposed new coffee shop previous / 0.0 km away / 27 May 2019Granted
- F17A/0508The removal of part of the existing glass canopy over and the construc / 0.0 km away / 17 October 2017Granted
- F16A/0503Change of use from retail store to fast food takeaway unit, alteration / 0.0 km away / 03 March 2017Granted
- F26A/0191E/R3The development will consist of the installation of 600 sq. m. of sola / 0.0 km away / 12 May 2026Granted
- F20A/0292The sub-division of retail unit 3 into two separate retail units with / 0.0 km away / 13 August 2020Granted
- F16A/0555Change of use from Coffee Shop to Healthcare (excluding G.P. Services) / 0.0 km away / 07 February 2017Granted
- F20A/0665Permission for change of use of the first floor toilet area from publi / 0.0 km away / 29 April 2021Granted