GrantedDecided 21 September 2020Fingal County Council

F20A/0204: Development will consist of 55 no residential units, 3 no. retail units, public open spaces, upgrades to the public road, reconstruction of the existing car park serving Smyths Bridge House (a Protected Structure), upgrade of the existing entrance onto Main Street, internal access roads, water services including a pumping station, surface water attenuation tank and detention basin, public lighting, 1 no. ESB substation and utilities. The residential element of the proposed development of 55 no. units comprises the following: 1 no. House Type B1: 3 Bedroom Two Storey Mid-Terrace House (110 sqm) 1 no. House Type C: 3 Bedroom Two Storey Mid-Terrace House (102 sqm) 1 no. House Type E: 3 Bedroom Two Storey Semi-Detached House (116.5 sqm) 2 no. House Type F: 3 Bedroom Two Storey Semi-Detached House ( 116.4 sqm) 2 no. House Type L: 4 Bedroom Three Storey Under parked Terraced House (182 sqm) 1 no. House Type L1: 4 Bedroom Three Storey Underparked Semi-Detached House ( 182 sqm) 1 no. House Type L2: 4 Bedroom Three Storey Underparked Semi-Detached House (182 sqm) 2 no. House Type M: 4 Bedroom Two Storey Terraced House (144.4 sqm) 1 no. House Type M1: 4 Bedroom Two Storey Semi-Detached House (144.4 sqm) 2 no. House Type N: 4 Bedroom Two Storey Semi-Detached (125.4 sqm) 4 no. 2 Bedroom Duplexes (98.4 sqm) (Block 1) 1 no. 2 Bedroom Apartment (110.9 sqm) (Block 2) 1 no. 1 Bedroom Apartment (57 sqm) (Block 3) 1 no. 2 Bedroom Apartment (83 sqm) (Block 3) 6 no. 1 Bedroom Apartment (50.7 sqm) (Block 4) 4 no. 1 Bedroom Apartment (54.5 sqm) (Block 4) 1 no. 1 Bedroom apartment (63.2 sqm) (Block 4), 2 no. 1 Bedroom apartment (64 sqm) (Block 4), 6 no. 2 Bedroom apartment (82.2 sqm) (Block 4), 2 no 2 Bedroom apartments (86 sqm) (Block 4), 6 no 2 Bedroom apartment (87.3 sqm) (Block 4), 6 no 2 Bedroom apartment (89 sqm) (Block 4) and 1 no. 3 Bedroom apartment (110 sqm) (Block 4). Proposed Block 1 is three storeys in height, Block 2 is two storeys, Block 3 is two storeys and Block 4 is four storeys. It is proposed to provide 1,600 sqm of public open space including a central playground and a pathway linking to the approved bridge over the railway line. The commercial element of the scheme comprises 2 no. retail units of 108 sqm each and 1 no retail unit of 45 sqm. It is proposed to reconfigure the existing permitted car park serving Smyths Bridge House to accommodate pedestrian, cyclist and limited vehicular access, 44 no. replacement car parking spaces. Works include the upgrade of 140 metres of Main Street including the Balcarrick Road Junction. It is proposed to provide 98 bike parking spaces to serve the proposed development and 112 no. car parking spaces in total to serve the proposed development and Smyths Pub. Proposed potable, surface and foul water services and utilities will be provided predominantly under the proposed roadways, with pumping station, attenuation tank and detention basin provided in the south of the subject site. The application is accompanied by a Natura Impact Statement (NIS). Add Info received 25th August 2020.

Lands to the South of Main Street, Corballis East, Donabate, Co Dubli
DecisionGrant permission
Decided21 September 2020
Application typePermission
Source documents47

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Fingal has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.