GrantedDecided 15 February 2021Fingal County Council

St. Maur's Church, Chapel Green, Sandy Road, Rush, Co Dublin

Planning application F20A/0289
DecisionGrant permission
Decided15 February 2021
Application typePermission
Source documents13

Site

What is on file

0refusal reasons11conditions8nearby records

Proposed development

Application description published by Fingal County Council.
Three temporary External Ball Courts with associated 3 metre high meta

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Development must be carried out in accordance with plans lodged 19 June 2020 and additional information received 19 January 2021.Compliance
  • 2Permission valid for 5 years only. On expiry, all structures and fencing must be removed and site reinstated to former condition per Landscape Reinstatement Plan.Landscaping Boundary
  • 3Layout must match Drawing No. 3987-BC-PL-0002-Rev1 received with additional information.Compliance
  • 4Prefabricated building must be grey; boundary fencing must be black.Design Materials
  • 5Bathroom windows must be fitted with obscure glass; film is not acceptable.Design Materials
  • 6No surface water to discharge into foul sewer. Drainage must comply with Greater Dublin Regional Code of Practice for Drainage Works Version 6.0.Wastewater Drainage
  • 7Applicant/developer must enter into water and/or wastewater connection agreement(s) with Irish Water prior to commencement.Water Services
  • 8Underground/overhead services relocated as necessary. Stormwater disposed to soakpits/drains on site, not onto public road. All works at developer's expense per FCC specifications.Wastewater Drainage
  • 9Construction hours restricted to 8am-7pm Mon-Fri and 8am-2pm Sat. No activities on Sundays or Bank Holidays.Construction Management
  • 10Contractor must prevent spillage of clay/rubble/debris on adjoining roads. Developer responsible for full cost of repair to adjoining public road.Construction Management
  • 11All public services (electrical, telephone, associated equipment) must be located underground throughout the entire site.Water Services

Planning a project near St. Maur's Church, Chapel Green, Sandy Road, Rush, Co Dublin?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.

Inside the decision file

Extracts from the council's own decision documents for this application — 50 pages of searchable text on file.

13 council documents — in the €39 site risk brief

Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 8 documents.

Source documents

Original council portal records and source PDFs where available.

13 council documents — in the €39 site risk brief

Site brief

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →