Naul National School, Hynestown, Naul Village, Dublin
Planning application F20A/0314
DecisionGrant permission
Decided12 October 2020
Application typePermission
Source documents14
Site
What is on file
0refusal reasons10conditions8nearby records
Proposed development
Application description published by Fingal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development to be carried out in accordance with lodged plans and additional information received 15 Sep 2020.Compliance
- 2Permission valid for 5 years. Structures to be removed on expiry unless retention permission granted.Compliance
- 3No surface water to discharge into foul sewer. Drainage to comply with Greater Dublin Regional Code of Practice for Drainage Works Version 6.0.Wastewater Drainage
- 4Prefabricated buildings to be grey in colour unless otherwise agreed in writing.Design Materials
- 5Prior to Phase 2 commencement, submit Irish Water PCE response and enter into water/wastewater connection agreement(s).Water Services
- 6All public services (electrical, telephone, etc.) to be located underground throughout the site.Water Services
- 7Bathroom windows to be fitted with permanently maintained obscure glass; film not acceptable.Compliance
- 8Contractor to prevent spillage/debris on adjoining roads and repair any road damage at own expense.Construction Management
- 9Construction hours restricted to 8am-7pm Mon-Fri and 8am-1pm Sat. No work on Sundays or Bank Holidays.Construction Management
- 10Noise and dust control measures per BS 5228:2009+A1:2014. 65dB threshold adopted. Dust management plan required.Construction Management
Planning a project near Naul National School, Hynestown, Naul Village, Dublin?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 46 pages of searchable text on file.Included in site brief
14 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 9 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
14 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- F13A/0060Provision of a revised parking facility/set down area / 0.0 km away / 16 April 2013Granted
- F12A/0227The removal of 2 no. existing prefabricated buildings and construction / 0.0 km away / 24 August 2012Granted
- F15A/0137Single storey school extension containing 1 no. classroom, 2 no. offic / 0.0 km away / 25 May 2015Granted
- F23A/0236The development will consist of the following: / 0.0 km away / 01 March 2024Granted
- F19A/0028A new agricultural shed, floor area - 182 sq/m max height 4.8m along w / 0.2 km away / 30 May 2019Granted
- F15A/0051Dwelling. / 0.3 km away / 31 March 2015Granted
- F16A/0311A new three bedroom storey and a half dwelling, new site entrance, gar / 0.3 km away / 07 September 2016Granted
- F24A/1107EPlanning permission for attic development to incorporate new study, se / 0.4 km away / 11 February 2025Granted