The Paddock, Killougher, Naul, Co. Dublin
Planning application F20A/0339
DecisionGrant permission
Decided08 September 2020
Application typePermission
Source documents9
Site
What is on file
0refusal reasons15conditions8nearby records
Proposed development
Application description published by Fingal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development carried out in entirety per plans/specs lodged 15 July 2020.Compliance
- 2Removes condition No. 8 of Reg. Ref. 90A/1224; authorises bungalow, garage, ETS, percolation, shared entrance, boundary treatment.Compliance
- 3Premises used solely as a single dwelling unit.Occupancy
- 4Occupancy restricted to applicant/immediate family for minimum 7 years from date of occupancy.Occupancy
- 5External finishes: neutral coloured render and natural roof slate (blue/black).Design Materials
- 6Garage use incidental to main dwelling; no independent sale/rent/lease, trade, business, or habitation.Occupancy
- 7Bathroom/en-suite windows fitted with permanently maintained obscure glass; film not acceptable.Design Materials
- 8Foul sewer & surface water: supervised construction by qualified professional; no cross-connections; compliance with Greater Dublin Regional Code of Practice / EPA Code.Wastewater Drainage
- 9Enter into water/wastewater connection agreement(s) with Irish Water prior to commencement.Water Services
- 10Maintain hedge for sightlines; entry-splay in bound road material; no obstructions >900mm near access; relocate services at developer's expense.Traffic Access
- 11Construction hours: 8am-7pm Mon-Fri, 8am-2pm Sat; no work on Sundays or Bank Holidays.Construction Management
- 12Prevent spillage on roads; developer responsible for full cost of road repair.Construction Management
Planning a project near The Paddock, Killougher, Naul, Co. Dublin?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 60 pages of searchable text on file.Included in site brief
9 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 6 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
9 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- F11B/0025Material alterations of the existing front and rear parapet to the mid / 0.0 km away / 30 March 2011Granted
- F22A/0336To construct; 1. Cubicle sheds with slatted tanks and feeding area yar / 0.2 km away / 14 December 2022Granted
- F12A/0259The construction of a new two storey single family dwelling. The prop / 0.2 km away / 23 November 2012Granted
- F14A/0226Retention permission for reconstruction, restoration and alterations m / 0.3 km away / 28 July 2014Granted
- F18A/0427Permission for (a) the renovation of the existing gatehouse to include / 0.6 km away / 14 September 2018Granted
- F23A/0691NIS The development will consist of planning permission for a period o / 0.8 km away / 13 December 2024Granted
- F17A/0580A detached dormer dwelling, on-site waste water treatment unit and per / 0.9 km away / 13 November 2017Granted
- F12A/0320The construction of a one and a one and a half storey extension to the / 0.9 km away / 04 December 2012Granted