3 Applewood Village Green, Applewood, Swords, Co. Dublin
Planning application F20A/0388
DecisionGrant permission
Decided30 September 2020
Application typePermission
Source documents9
Site
What is on file
0refusal reasons12conditions8nearby records
Proposed development
Application description published by Fingal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development must be carried out in accordance with lodged plans, particulars, and specifications.Compliance
- 2Pedestrian ramp details, footpath reinstatement, and entrance tie-in to be agreed on site with Area Engineer. Third-party access consent required if applicable. Works at applicant's expense per FCC specifications.Traffic Access
- 3All stormwater disposed to soakpits or drains within the site; no discharge onto the public road.Wastewater Drainage
- 4Operating hours restricted to 7am-10pm Monday to Sunday.Occupancy
- 5Security shutters (if required) located behind window glazing, lattice see-through type, matching frontage colour.Design Materials
- 6Signage limited to individual back-lit letters on existing fascia, max 40cm height, not internally illuminated.Design Materials
- 7No additional external advertising signs, banners, canopies, flags, or projecting elements without prior Planning Authority approval.Design Materials
- 8Construction noise per BS.5228:2009+A1:2014 with silencers/acoustic covers. Dust/pollutant containment during construction. Gym acoustically soundproofed with anti-vibration flooring. Mechanical services non-nuisance. No external classes or amplified music.Construction Management
- 9All waste securely stored on-site prior to authorised collection; no storage on footpath, road, or car park.Other
- 10Contractor must prevent road spillage/debris and bear full cost of repairing any damage to adjoining public roads.Construction Management
- 11Construction hours: 8am-7pm Mon-Fri, 8am-2pm Sat. No work Sun/Bank Holidays or 7pm-8am. Deliveries 8am-7pm. Night works require Environmental Health consultation. Advance notice required for out-of-hours work.Construction Management
- 12Payment of €6,595 (indexed to Tender Price Index at commencement) to Planning Authority for public infrastructure/facilities per Fingal County Contribution Scheme. Phasing agreed in writing prior to commencement.Development Contribution
Planning a project near 3 Applewood Village Green, Applewood, Swords, Co. Dublin?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 36 pages of searchable text on file.Included in site brief
9 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 5 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
9 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- F12A/0200The change of use from previously approved shop to hot food take-away. / 0.0 km away / 20 August 2012Granted
- F14A/0302Permission for a change of use from a Hardware and DIY store / 0.1 km away / 04 November 2014Granted
- F12A/0040New single storey boiler room / 0.1 km away / 12 April 2012Granted
- F11A/0191The proposed development of a 2 storey extension to the existing 8 cla / 0.1 km away / 17 November 2011Granted
- F24A/0695ERemoval of an existing single storey conservatory structure to the rea / 0.2 km away / 12 September 2024Granted
- F19B/0335Conversion of attic space and insertion of dormer window to the rear / 0.2 km away / 24 February 2020Granted
- F22B/0229Planning permission for conversion of existing attic space comprising / 0.2 km away / 30 January 2023Granted
- F17B/0028An attic conversion which will include the construction of a dormer ro / 0.2 km away / 20 April 2017Granted