GrantedDecided 27 January 2021Fingal County Council

Site No 7 on South Shore Cove, Off South Shore Road, Rush, Co Dublin

Planning application F20A/0503
DecisionGrant permission
Decided27 January 2021
Application typePermission
Source documents11

Site

What is on file

0refusal reasons14conditions8nearby records

Proposed development

Application description published by Fingal County Council.
Permission for a 3 bedroom dwelling, part two storey, part single stor

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Development must be carried out in accordance with plans lodged 8 Oct 2020 and additional information received 7 Dec 2020.Compliance
  • 2Design and floor plans must accord with revised drawings received 7 Dec 2020.Design Materials
  • 3Premises must be used as a single dwelling unit.Occupancy
  • 4Occupancy restricted to applicant/immediate family for minimum 7 years from date of occupancy.Occupancy
  • 5External finishes: blue/black roof slates, neutral coloured render, limestone cladding, cedar finish.Design Materials
  • 6Bathroom/en-suite windows must use permanently maintained obscure glass; film not acceptable.Other
  • 7No surface water to foul sewer. Drainage must comply with Greater Dublin Regional Code of Practice for Drainage Works Version 6.0.Wastewater Drainage
  • 8Enter into water/wastewater connection agreement(s) with Irish Water prior to commencement.Water Services
  • 9Footpath/kerb dished; front boundary max 900mm; visibility triangle max 900mm; dividing wall max 0.9m over last 3m; 2-car parking with turning area; underground services; stormwater to on-site soakpits; access gradient max 2.5% over last 6m; all at developer's expense.Traffic Access
  • 10Construction hours restricted to 8am-7pm Mon-Fri, 8am-2pm Sat; no work on Sundays/Bank Holidays.Construction Management
  • 11Prevent spillage of debris on roads; developer responsible for full cost of road damage repair.Construction Management
  • 12All public services (electrical, telephone) must be located underground throughout the site.Other

Planning a project near Site No 7 on South Shore Cove, Off South Shore Road, Rush, Co Dublin?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.

Inside the decision file

Extracts from the council's own decision documents for this application — 54 pages of searchable text on file.

11 council documents — in the €39 site risk brief

Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 7 documents.

Source documents

Original council portal records and source PDFs where available.

11 council documents — in the €39 site risk brief

Site brief

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →