Cornstown, Ashbourne, Co. Dublin
Planning application F20A/0513
DecisionRefuse permission
Decided07 December 2020
Application typePermission
Source documents8
Site
What is on file
3refusal reasons5conditions8nearby records
Proposed development
Application description published by Fingal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Rural Housing NeedTraffic SightlinesRural Housing Need
Included in site brief
3 refusal reasons and 8 council documents — in the €39 site risk brief
Site brief
Conditions
- 1House must be first occupied as permanent residence by applicant/immediate family for minimum 7 years per Objective RF33.Occupancy
- 2Deficit in required sightlines must be addressed; speed survey required if deviation from 80km/hr posted limit is sought.Traffic Access
- 3WWTS and percolation area must comply with EPA Code of Practice Wastewater Treatment Systems Serving Single Dwellings (2009).Wastewater Drainage
- 4Applicant must sign a connection agreement with Irish Water prior to commencement and comply with Irish Water standards.Water Services
- 5Existing hedgerow on northern/western boundary to be retained and protected. Native hedgerow to be planted along eastern/southern boundaries within first planting season.Landscaping Boundary
Planning a project near Cornstown, Ashbourne, Co. Dublin?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 43 pages of searchable text on file.Included in site brief
3 refusal reasons and 8 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 5 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
3 refusal reasons and 8 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- F24A/0488EThe development will consist of: / 0.1 km away / 13 December 2024Refused
- F19A/0384Permission is sought for a detached dormer dwelling, on-site waste wat / 0.1 km away / 12 December 2019Refused
- F20A/0512A detached dormer dwelling, in-site wastewater treatment unit and perc / 0.1 km away / 07 December 2020RefusedRural Housing Need
- F20A/0055Permission is sought for a detached dormer dwelling, on-site waste wat / 0.1 km away / 26 March 2020RefusedRural Housing Need
- F25A/0212EThe Retention Planning Permission consists of the retention of a detac / 0.2 km away / 06 May 2025Refused
- F14A/03794 bed detached dormer bungalow with on site waste water treatment unit / 0.3 km away / 04 November 2014Refused
- F14A/0271Construction of a 2-storey dwelling house, detached domestic garage, p / 0.9 km away / 01 September 2014Refused
- F20A/0611Permission for erection of a 3 bedroom 1.5 storey dwelling and session / 0.9 km away / 29 January 2021RefusedRural Housing Need