Ardgillan Community College, Castlelands, Balbriggan, Co Dublin
Planning application F20A/0546
DecisionGrant permission
Decided16 December 2020
Application typePermission
Source documents8
Site
What is on file
0refusal reasons6conditions8nearby records
Proposed development
Application description published by Fingal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development must be carried out in accordance with lodged plans, particulars and specifications.Compliance
- 2External finishes must match drawings received 30 Oct 2020 unless agreed in writing prior to commencement.Design Materials
- 3No surface water to discharge to foul sewer. Drainage must comply with Greater Dublin Regional Code of Practice for Drainage Works Version 6.0 (FCC April 2006).Wastewater Drainage
- 4Toilet windows must be fitted with permanently maintained obscure glass; film is not acceptable.Other
- 5Prevent spillage/deposit of materials on adjoining roads. Developer bears full repair costs for any road damage.Construction Management
- 6Construction hours restricted to 0800-1900 Mon-Fri and 0800-1400 Sat. No work on Sundays or Bank Holidays.Construction Management
Planning a project near Ardgillan Community College, Castlelands, Balbriggan, Co Dublin?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 30 pages of searchable text on file.Included in site brief
8 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 5 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
8 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- F20A/0151Changes to previously granted Planning Permission F19A/0361 for the in / 0.0 km away / 10 July 2020Granted
- F19A/0361Installation of a single prefabricated temporary accommodation buildin / 0.0 km away / 30 September 2019Granted
- F14A/0184Retention of relocated substation as an amendment to previously approv / 0.0 km away / 02 July 2014Granted
- F12A/0131Development on a site measuring approximately 2.11 hectares. The deve / 0.0 km away / 27 June 2012Granted
- F23A/0253The installation of an aircraft noise monitoring terminal on a standal / 0.0 km away / 02 August 2023Granted
- F12A/0064A two storey temporary accommodation block admeasuring circa 350 sq.m. / 0.0 km away / 27 April 2012Granted
- F13A/0047Construction of 2 no. 2 storey temporary classroom accommodation block / 0.1 km away / 04 April 2013Granted
- F18A/0067The construction of 38 No dwellings units, comprising of 12 No 2 store / 0.1 km away / 10 April 2018Granted