Off Palmer Road, Rush, Co. Dublin
Planning application F20A/0587
DecisionGrant permission
Decided22 January 2021
Application typePermission
Source documents7
Site
What is on file
0refusal reasons14conditions8nearby records
Proposed development
Application description published by Fingal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development carried out in accordance with lodged plans, particulars and specifications.Compliance
- 2Access requirements: visibility triangle height limit, storm water disposal, footpath/kerb dishing, max entrance width, no gate across road.Traffic Access
- 3Surface water to soakaway complying with BRE Digest 365/GDSDS (30-year storm event). No discharge to foul sewer. Compliance with GDR Code of Practice.Wastewater Drainage
- 4Enter into water and/or wastewater connection agreement with Irish Water prior to commencement.Water Services
- 5External finishes as indicated on elevational drawings unless agreed in writing.Design Materials
- 6Unit not occupied until all services connected and operational.Occupancy
- 7House used as single dwelling unit apart from exempted development.Occupancy
- 8Bathroom/en-suite windows fitted with obscure glass. Film not acceptable.Design Materials
- 9Prevent spillage/deposit of materials on adjoining roads. Remove immediately at developer's expense.Construction Management
- 10Developer responsible for full cost of repair for any damage to adjoining public road.Construction Management
- 11All public services (electrical, telephone, etc.) located underground throughout the entire site.Compliance
- 12Construction hours restricted to 8am-7pm Mon-Fri, 8am-2pm Sat. No work on Sundays/Bank Holidays.Construction Management
Planning a project near Off Palmer Road, Rush, Co. Dublin?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 34 pages of searchable text on file.Included in site brief
7 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 5 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
7 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- F26A/0392EThe development will consist of an attic conversion including a change / 0.0 km away / 08 July 2026Granted
- F13A/0479Demoilsh an existing single storey dwelling (80sq.m) and remove associ / 0.0 km away / 18 February 2014Granted
- F12B/0009Single storey extension to side at rear. / 0.0 km away / 12 March 2012Granted
- F25A/0440EConversion of existing attic space comprising of modification of exist / 0.1 km away / 08 July 2025Granted
- F16B/0295A. two storey extension to rear. B. All associated site works to rear / 0.1 km away / 14 March 2017Granted
- F21B/0351Permission for conversion of existing attic space comprising of modifi / 0.1 km away / 10 December 2021Granted
- F14B/0049Dormer extension to rear and rooflight to front. / 0.1 km away / 02 May 2014Granted
- F06A/0775/E1Residential development consisting of 4 detached 4 bedroom two storey / 0.1 km away / 23 January 2012Granted