Townlands of Maynetown and Drumnigh, Portmarnock, Co Dublin
Planning application F20A/0700
DecisionGrant permission
Decided06 April 2021
Application typePermission
Source documents16
Site
What is on file
0refusal reasons9conditions8nearby records
Proposed development
Application description published by Fingal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development must be carried out in accordance with lodged plans, particulars, and specifications.Compliance
- 2Traffic management plan must be agreed with the Planning Authority prior to operation of the access.Traffic Access
- 3Applicant must engage with ERVA section of Irish Water to ensure no impact on proposed GDD project.Wastewater Drainage
- 4No surface water/rainwater to discharge into foul system. Surface water drainage must comply with Greater Dublin Regional Code of Practice for Drainage Works.Wastewater Drainage
- 5Landscaping details including boundary fencing, grass verges and hedge & tree planting at Skylark Park location to be implemented prior to opening of haul road.Landscaping Boundary
- 6Protective fencing to BS5837:2012 standard to be installed prior to commencement of site clearance works.Construction Management
- 7Developer must agree with Planning Authority scope, timing & finish details of landscape re-instatement works prior to decommissioning of haul road.Construction Management
- 8Prevent spillage/deposit of materials on adjoining roads. Developer responsible for full cost of repair for any damage to adjoining public road.Construction Management
- 9Construction hours restricted to 8.00am to 7.00pm, Mon-Fri, and 8.00am to 2.00pm on Saturdays. No work on Sundays or Bank Holidays.Construction Management
Planning a project near Townlands of Maynetown and Drumnigh, Portmarnock, Co Dublin?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 17 pages of searchable text on file.Included in site brief
16 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 3 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
16 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- F19A/0400New wastewater pumping station on an approcimately 0.5ha site / 0.1 km away / 22 June 2020Granted
- F21A/0389The development will consist of (1) a new wastewater pumping station c / 0.1 km away / 25 August 2022Granted
- LRD0037/S3The proposed develoment comprises amendments to the permitted Strategi / 0.1 km away / 29 January 2024Granted
- F25A/0839EPlanning permission for: Conversion of existing attic to storage room / 0.1 km away / 05 November 2025Granted
- LRD0077/S3EThe proposed development comprises minor modifications to in-curtilage / 0.1 km away / 14 November 2025Granted
- LRD0002/S3The development proposed (Phase 1E) will consist of: - 195no. units (2 / 0.1 km away / 06 November 2024Granted
- LRD0058/S3EThe development proposed (Phase 1F) will consist of: - 296no. resident / 0.2 km away / 10 December 2025Granted
- F24A/0301Planning permission for the conversion of an existing attic space to a / 0.3 km away / 14 May 2024Granted