GrantedDecided 12 August 2020Fingal County Council

F20B/0125: Refurbishment and part single and part two storey extension

39 Cherry Avenue, Swords, Co Dublin
DecisionGrant permission
Decided12 August 2020
Application typePermission
Source documents7

Site

What is on file

0refusal reasons8conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Fingal is in progress.

Conditions

  • 1Development must be carried out in accordance with lodged plans, particulars, and specifications.Compliance
  • 2First floor side elevation bathroom window must be permanently fitted with obscure glazing for privacy.Other
  • 3Submit noise assessment prior to commencement demonstrating habitable room noise levels can be achieved/maintained with mitigation per FDP.Other
  • 4External finishes must harmonise in colour and texture with the existing dwelling.Design Materials
  • 5Premises must be used solely as a single dwelling unit (excluding exempt development).Occupancy
  • 6No surface water discharge into foul sewer. Surface water drainage must comply with Greater Dublin Regional Code of Practice for Drainage Works v6.0.Wastewater Drainage
  • 7Contractor must prevent road spillage/debris and bear full repair costs for any damage to adjoining public road.Construction Management
  • 8Construction hours restricted to 0800-1900 Mon-Fri, 0800-1400 Sat. No work on Sundays/Bank Holidays. Deviations require prior written approval.Construction Management

Planning a project near 39 Cherry Avenue, Swords, Co Dublin?

Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Full reasons for every nearby decision are in the site report →