Aherlow 1A Offington Park Sutton, Dublin 13
Planning application F20B/0134
DecisionGrant permission
Decided14 August 2020
Application typePermission
Source documents6
Site
What is on file
0refusal reasons8conditions8nearby records
Proposed development
Application description published by Fingal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development to be carried out in accordance with lodged plans, particulars, and specifications.Compliance
- 2Bathroom and en-suite windows must be fitted with permanently maintained obscure glass; film is not acceptable.Compliance
- 3Premises to be used solely as a single dwelling unit, excluding exempted development.Occupancy
- 4External finishes must harmonise in colour and texture with the existing premises per plans submitted 24 June 2020.Design Materials
- 5Surface water drainage proposal to be submitted prior to commencement following SuDS principles and GDSDS compliance; no surface water to foul system; compliance with Greater Dublin Regional Code of Practice for Drainage Works v6.0.Wastewater Drainage
- 6Measures to prevent spillage/deposit of materials on adjoining roads; applicant responsible for full cost of repair for any damage to the public road.Construction Management
- 7Construction hours restricted to 8am-7pm Mon-Fri and 8am-2pm Sat; no work on Sundays or Bank Holidays; deviations require prior written approval.Construction Management
- 8Payment of €1,964 (updated at commencement per Tender Price Index) to Planning Authority for public infrastructure/facilities; phasing to be agreed in writing prior to commencement.Development Contribution
Planning a project near Aherlow 1A Offington Park Sutton, Dublin 13?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 28 pages of searchable text on file.Included in site brief
6 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 4 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
6 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- F17B/0142Permission for the partial enclosing of existing ground floor patio / 0.0 km away / 27 July 2017Granted
- F11B/0262Proposed (a) Fenestration alterations to front, at both ground floor & / 0.0 km away / 10 February 2012Granted
- F20B/0168Proposed single -storey extension to side. / 0.1 km away / 10 September 2020Granted
- F25A/0981EPermission sought for a proposed single-storey extension to rere, / 0.1 km away / 11 June 2026Granted
- F14B/0105Demolition of the existing garage, construction of a new single storey / 0.1 km away / 24 June 2014Granted
- F16B/0171Permission for proposed single storey extension to rear and retention / 0.1 km away / 11 August 2016Granted
- F15A/0148The demolition of an existing garage & shed and the construction of a / 0.1 km away / 02 June 2015Granted
- F23B/0118Planning permission to convert the attic / 0.1 km away / 05 January 2024Granted