20 Boroimhe Aspens, Swords, Co Dublin, K67 EF88
Planning application F20B/0279
DecisionGrant permission for retention
Decided08 January 2021
Application typeRetention
Source documents4
Site
What is on file
0refusal reasons13conditions8nearby records
Proposed development
Application description published by Fingal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development carried out in entirety in accordance with lodged plans, particulars and specifications.Compliance
- 2Permission relates solely to that detailed in the statutory public notices.Compliance
- 3Site is within Airport Noise Zone B. Applicant must submit noise assessment by a qualified person, demonstrate internal noise levels, and provide details of materials/construction methods for written approval within 12 months of Final Grant.Design Materials
- 4External finishes shall harmonise in colour and texture with the existing dwelling on site.Design Materials
- 5Entire premises shall be used as a single dwelling unit apart from exempted development.Occupancy
- 6All public services including electrical, telephone cables and associated equipment be located underground throughout the entire site.Water Services
- 7No surface water/rainwater shall discharge into the foul sewer system. Surface water drainage shall comply with 'Greater Dublin Regional Code of Practice for Drainage Works Version 6.0' FCC April 2006.Wastewater Drainage
- 8Where connecting to public water/wastewater network operated by Irish Water, applicant must sign a connection agreement with Irish Water prior to commencement and adhere to standards/conditions.Wastewater Drainage
- 9Measures to prevent spillage/deposit of clay, rubble or debris on adjoining roads. Immediate removal at developer's expense. Developer responsible for full cost of repair for damage to adjoining public road.Construction Management
- 10Construction hours restricted to 0800-1900 Mon-Fri, 0800-1400 Sat. No activities on Sundays/Bank Holidays. No annoying activities between 1900-0800. No deliveries before 0800 or after 1900.Construction Management
- 11No development commenced until security for provision/completion of services (roads, open spaces, car parks, drains) to taking-in-charge standard given by bond or cash sum.Development Contribution
- 12Prior to commencement, pay financial contribution in lieu of open space provision towards cost of amenity works based on shortfall of sqm of open space.Development Contribution
Planning a project near 20 Boroimhe Aspens, Swords, Co Dublin, K67 EF88?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 28 pages of searchable text on file.Included in site brief
4 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 3 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
4 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- F24A/0530The development will consist of / 0.0 km away / 31 July 2024Granted
- F17A/0138The site forms part of previously approved Scheme under Reg. Ref. F16A / 0.1 km away / 04 July 2017Granted
- F16A/0060Construction of 6 No two storey houses comprising 1 No 5 Bed Detached / 0.1 km away / 12 July 2016Granted
- F15B/0128Permission for two storey extension to rear of existing dwelling to i / 0.1 km away / 14 July 2015Granted
- F20B/0051Conversion of existing attic to bedroom, with dormer extension to side / 0.1 km away / 06 January 2021Granted
- F19B/0123A proposed two storey hipped roof front and side elevation; a single s / 0.1 km away / 03 July 2019Granted
- F15B/0253Convert the existing attic space for storage use, construct a dormer w / 0.1 km away / 15 January 2016Granted
- F19B/0167Retention for the conversion of the attic space to storage use / 0.1 km away / 19 August 2019Granted