Westown, Naul, Co Dublin
Planning application F21A/0107
DecisionGrant permission
Decided23 February 2022
Application typePermission
Source documents17
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Fingal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Westown, Naul, Co Dublin?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 95 pages of searchable text on file.Included in site brief
17 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 10 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
17 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- 22322Partial demolition of existing dwelling, new 2 storey extension with single storey link to existing dwelling, new 2 bay garage with home office in loft, replace existing septic tank with proprietary waste water treatment system, SuDS drainage and all associated site works. Significant further information/revised plans submitted on this application / 0.3 km away / 22 June 2022Granted
- F21B/0169Construction of new single storey extension and creation of new single / 0.4 km away / 03 September 2021Granted
- F19B/0311A) Two storey extension to the side and rear of existing dwelling with / 0.4 km away / 14 October 2020Granted
- F21A/0514Construction of new single storey garage to the rear and side of the p / 0.4 km away / 17 November 2021Granted
- F12A/0188Part two storey, part single storey extension to rear of existing dwel / 0.4 km away / 08 August 2012Granted
- F13A/0043Side granny flat extension to existing dwelling including all associat / 0.6 km away / 02 April 2013Granted
- AA191263The development will consist of: Extraction and processing on site, to include washing (with associated closed system silt settlement lagoons), screening and crushing; storage; stockpiling and haulage of sand and gravel to principally service the existing readymix concrete plant operated by Kilsaran Concrete on the eastern side of the R108 regional road and permitted under P. Ref. 80/572; The total extraction area extends to an area of c.6.9 hectares and will be worked (extracted and restored) on a phased basis; Phased stripping and storage of topsoil and overburden materials for reuse in the restoration works. Restoration of the site will be to a beneficial agricultural after-use; Access to the site will be through the existing agricultural enterprise site entrance onto the R108 regional road with upgrade of same and provision for the upgrade of the existing internal access track and section of a new access track; All associated site works within an overall application area of c.17 hectares, and all for a period of 9 years plus 1 year to complete restoration works (total duration of 10 years). An Environmental Impact Assessment Report (EIAR) has been prepared in respect of this planning application. Significant further information/revised plans submitted on this application / 0.7 km away / 28 July 2020Granted
- 2461041Extraction and processing on site, to include washing (with associated closed recycled washing plant and lagoon system), screening and crushing plant; storage; stockpiling and haulage of sand and gravel to service the existing readymix concrete plant operated by Kilsaran on the eastern side of the R108 regional road and permitted under P. Ref. 80/572 & 22/153 (ABP-314881-22); The total extraction proposal extends to an area of c. 6.2 hectares and will be worked (extracted and restored) on a phased basis for a period of 11 years plus 1 year to complete final restoration works (total duration of 12 years); Phased stripping and storage of topsoil and overburden materials for reuse in the restoration works. Restoration of the site will be to a beneficial agricultural after-use; • Access to the site will be through the existing agricultural enterprise site entrance onto the R108 regional road with upgrade of same to consist of setting-back of the existing boundary wall to the north of the site access, and provision for the upgrade of the existing internal access track and sections of a new access track which will include a new weighbridge; and All associated site ancillary works within an overall application area of c. 14.9 hectares. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of this planning application. Significant further information/revised plans submitted on this application / 0.7 km away / 06 November 2025Granted