GrantedDecided 03 November 2021Fingal County Council

No.58 Craoibhin Park, Balbriggan, Co. Dublin

Planning application F21A/0484
DecisionGrant permission
Decided03 November 2021
Application typePermission
Source documents9

Site

What is on file

0refusal reasons11conditions8nearby records

Proposed development

Application description published by Fingal County Council.
Permission is sought for a) new front porch extension

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Development to be carried out in entirety in accordance with lodged plans, particulars and specifications.Compliance
  • 2Permission relates solely to aspects detailed in statutory public notices as amended by conditions.Compliance
  • 3Premises to be used as a single dwelling unit apart from exempted development.Occupancy
  • 4First floor windows serving bathroom and ensuite to be fitted with permanently maintained obscure glass. Film not acceptable.Design Materials
  • 5External finishes to harmonise in colour and texture with existing premises.Design Materials
  • 6All public services including electrical and telephone cables to be located underground throughout the entire site.Water Services
  • 7Entrance width not to exceed 4.0m. Visibility triangle objects not to exceed 900mm height. Existing pedestrian access to be closed off. Electronic gate/railings to match elevation drawing. Driveway to utilise semi/permeable surface with SuDS. Footpath/kerb to be dished.Traffic Access
  • 8No surface water to discharge into foul sewer. Surface water drainage to comply with Greater Dublin Regional Code of Practice for Drainage Works Version 6.0. Soakaway to comply with BRE Digest 365, GDSDS, accommodate 30-year critical duration storm event, be at least 5m from any structure and 3m from any boundary.Wastewater Drainage
  • 9Measures to prevent spillage/debris on adjoining roads. Developer responsible for full cost of repair for any damage to adjoining public road.Construction Management
  • 10Works to be carried out between 0800-1800 Mon-Fri and 0830-1400 Sat. No work on Sundays or Bank Holidays.Construction Management
  • 11Payment of €2,946 (updated at commencement) to Planning Authority for public infrastructure and facilities. Phasing to be agreed in writing prior to commencement.Development Contribution

Planning a project near No.58 Craoibhin Park, Balbriggan, Co. Dublin?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.

Inside the decision file

Extracts from the council's own decision documents for this application — 29 pages of searchable text on file.

9 council documents — in the €39 site risk brief

Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 4 documents.

Source documents

Original council portal records and source PDFs where available.

9 council documents — in the €39 site risk brief

Site brief

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →