GrantedDecided 22 August 2022Fingal County Council

Balscadden, Co. Dublin.

Planning application F22A/0180
DecisionGrant permission
Decided22 August 2022
Application typePermission
Source documents11

Site

What is on file

0refusal reasons10conditions8nearby records

Proposed development

Application description published by Fingal County Council.
New part dormer/part two storey detached dwelling with new onsite wast

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Development to be carried out in entirety in accordance with lodged plans, particulars and specifications, as amended by additional information received 26 July 2022.Compliance
  • 2Bathroom/ensuite windows permanently fitted with obscured glazing. Front entrance door shall be wooden. Stone finish details submitted for written agreement prior to commencement.Design Materials
  • 3Stone removed to facilitate vehicular entrance shall be re-used to fill in existing entrance in a sensitive manner to ensure preservation of existing boundary wall.Design Materials
  • 4Entire premises shall be used as a single dwelling unit apart from such use as may be exempted development.Occupancy
  • 5Site suitability assessments for on-site wastewater treatment systems carried out by suitably qualified professional. No surface water into foul system. No foul drainage into surface water. Sign connection agreement with Irish Water prior to commencement.Wastewater Drainage
  • 6No objects/landscaping within visibility triangle exceeding 900mm. No gate across public footpath/roadway. Access width max 4m. Entry splay constructed in bound road material. Services relocated at developer's expense. Stormwater disposed to soakpits/drains within site.Traffic Access
  • 7Existing stone wall, ditch and hedgerow protected from accidental damage during construction. All other hedgerows protected. 9 native tree species (oak, pine or similar mix) planted within garden within first planting season.Landscaping Boundary
  • 8Measures taken to prevent spillage/deposit of clay, rubble or debris on adjoining roads. Developer responsible for full cost of repair for any damage to adjoining public road.Construction Management
  • 9Construction hours restricted to 8.00am-7.00pm Mon-Fri, 8.00am-2.00pm Sat. No activities on Sundays or Bank Holidays.Construction Management
  • 10Pay sum of €24,752 (updated at date of commencement) to Planning Authority as contribution towards public infrastructure and facilities. Phasing of payments agreed in writing prior to commencement.Development Contribution

Planning a project near Balscadden, Co. Dublin.?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.

Inside the decision file

Extracts from the council's own decision documents for this application — 76 pages of searchable text on file.

11 council documents — in the €39 site risk brief

Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 8 documents.

Source documents

Original council portal records and source PDFs where available.

11 council documents — in the €39 site risk brief

Site brief

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →