15 Baily Green Road, Howth, Dublin 13
Planning application F22A/0362
DecisionGrant permission
Decided08 September 2022
Application typePermission
Source documents8
Site
What is on file
0refusal reasons11conditions8nearby records
Proposed development
Application description published by Fingal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development carried out in entirety in accordance with lodged plans, particulars and specifications.Compliance
- 2Entire premises used as a single dwelling unit apart from exempted development.Compliance
- 3External finishes as indicated unless agreed in writing prior to commencement.Design Materials
- 4Bathroom/en-suite windows fitted with obscure glass; film not acceptable.Other
- 5Attic floorspace not complying with Building Regulations not for human habitation.Compliance
- 6Surface water drainage per GDRCOP, no discharge to foul system, soakaway per BRE Digest 365/GDSDS (30-year storm, 5m from structure, 3m from boundary).Wastewater Drainage
- 7Vehicular entrance increased to 4m, revised detail submitted prior to commencement, no objects >900mm in visibility triangle, no gate across footpath, footpath/kerb dished, services relocated, stormwater to soakpits/drains within site.Traffic Access
- 8Removed garden trees/hedging replaced with like-for-like planting per Howth SAAO Design Guidelines within first planting season.Landscaping Boundary
- 9Prevent spillage/debris on adjoining roads, responsible for repair of damage to public road.Construction Management
- 10Construction hours restricted (8am-7pm Mon-Fri, 8am-2pm Sat), no work on Sundays/Bank Holidays.Construction Management
- 11Development contribution of €2,981 (updated per TPI) prior to commencement.Development Contribution
Planning a project near 15 Baily Green Road, Howth, Dublin 13?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 33 pages of searchable text on file.Included in site brief
8 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 4 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
8 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- F09A/0373/E1Extend and remodel the existing bungalow. The works include the demol / 0.0 km away / 09 January 2015Granted
- F13B/0148Demolitish existing single storey shed and studio to rear and to build / 0.0 km away / 13 December 2013Granted
- F19B/0298Demolition of a single storey extension to the side of a dwellinghouse / 0.1 km away / 15 January 2020Granted
- F21B/0146Permission for alterations/extension to the existing two storey detach / 0.1 km away / 10 June 2021Granted
- F17A/0002The development will consist of (i) demolition of existing one and hal / 0.1 km away / 19 April 2017Granted
- F18A/0135Demolition of existing one and a half storey dwelling (Tomar House) / 0.1 km away / 14 May 2018Granted
- F18A/0134The development will consist of: (i) Demolition of existing one and ha / 0.1 km away / 14 May 2018Granted
- F18A/0136The development will consist of: (i) Demolition of existing one and ha / 0.1 km away / 14 May 2018Granted