F22A/0559: The development will consist of a cemetery including 5,806 no traditional burial plots; 617 No. ash internment plots; biodegradable garden plots; a Columbarium wall; 223 No granite marker posts; 110 No. memorial plaques; 1 No. single storey reception building (215m2 Gross floor area (GFA)) comprising a reception, 1 no. office, 1 no. reception store, WC, Kitchenette, with photovoltaic (PV) solar panels at roof level; and ancillary bin and battery storage structures. The development will be served by a new vehicular access from Carrickbrack road; 87 no. car parking (72 No. spaces with a car park to south of the reception building and 15 no. with an overflow car park); 4 no bicycle parking stands: and all associated hard and soft landscape and boundary treatment works; provision of SUDS measures, associated lighting, site services (foul and surface water drainage and water supply); and all other associated site excavation, infrastructural and side development works above and below ground. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application. AI received 17/05/23
'Deer Park Hotel and Golf', Deerpark, Carrickbrack Road, Howth Co. Dub
DecisionRefuse permission
Decided07 July 2023
Application typePermission
Source documents21
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / 9920CB7D757F11EDB75A9C7BEFBB54FD.tif / Document 819652Source PDF
- Notification Of DecisionSource: planningapi.agileapplications.ie / E2F737581F1611EEB7ED9C7BEFBB54FD.tif / Document 884630Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / 9920CB80757F11EDB75A9C7BEFBB54FD.tif / Document 760980Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / E2F7375B1F1611EEB7ED9C7BEFBB54FD.tif / Document 884631Source PDF
- ReportsSource: planningapi.agileapplications.ie / 4E7417A0560111ED8612005056926A5C.pdf / Document 750970Source PDF
- ReportsSource: planningapi.agileapplications.ie / 69F4D8EB698011ED868100505692B757.docx / Document 754949Source PDF
- ReportsSource: planningapi.agileapplications.ie / 69F4D8EE698011ED868100505692B757.docx / Document 755300Source PDF
- ReportsSource: planningapi.agileapplications.ie / 966437BA666B11ED868100505692A522.docx / Document 759691Source PDF
- ReportsSource: planningapi.agileapplications.ie / 90B3A0BE63F711EDB8E284C5A60C64E3.doc / Document 759998Source PDF
- ReportsSource: planningapi.agileapplications.ie / 9947689855FD11ED8612005056926A5C.pdf / Document 760737Source PDF
- ReportsSource: planningapi.agileapplications.ie / A6C0742255FD11ED8612005056926A5C.pdf / Document 761369Source PDF
- ReportsSource: planningapi.agileapplications.ie / BB4D72EF5EAA11ED867E00505692F02D.docx / Document 764697Source PDF
- ReportsSource: planningapi.agileapplications.ie / ED660F156F0511ED8681005056926BDB.docx / Document 769853Source PDF
- ReportsSource: planningapi.agileapplications.ie / 95B4E462638F11ED867E00505692966A.pdf / Document 819529Source PDF
- ReportsSource: planningapi.agileapplications.ie / 30A0805715AB11EEB7194CEBBDB391AE.docx / Document 830858Source PDF
- ReportsSource: planningapi.agileapplications.ie / 5417800C0B5811EEB7104CEBBDB391AE.docx / Document 867857Source PDF
- ReportsSource: planningapi.agileapplications.ie / 6DF4873E005611EE8688005056924457.docx / Document 871280Source PDF
- ReportsSource: planningapi.agileapplications.ie / C350E0FE143111EE904BB05CDAAC4CDB.docx / Document 881237Source PDF
- ReportsSource: planningapi.agileapplications.ie / CD68644E05CD11EE868800505692A2FE.docx / Document 882437Source PDF
- ReportsSource: planningapi.agileapplications.ie / EDE6266206B411EEB93A84C5A60C64E3.pdf / Document 885869Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- F24A/0843EThe development will consist of a new 100m x 59m all weather training pitch to replace the existing grass pitch, 6 No. 15m high floodlighting columns, pitch perimeter fencing consisting of 2.4m high mesh fence and 6m high ball-catch netting, widening of the existing vehicular entrance onto carrickbrack road, on-site hard standing car parking area and all associated site works. AI Received 10/01/2025 / 0.3 km away / 06 February 2025Refused
- F23A/0277The development will consist of / 0.3 km away / 30 November 2023Refused
- F16A/0017Re-design of 3 no. dwellings from the previously approved 5 no. dwelli / 0.3 km away / 16 March 2016Refused
- F14A/0343Demolition of existing single family detached house and the erection o / 0.5 km away / 14 October 2014Refused
- F18A/0271Demolition of existing dormer bungalow and the construction of one new / 0.6 km away / 22 January 2019Refused
- F25A/1196EThe development will consist of the construction of 4 no. two-storey 4-bed detached houses with associated car parking, new shared vehicular and pedestrian access onto Carrickbrack Road, landscaping, boundary treatments, and all associated site works necessary to facilitate the development, including new drainage connections on Carrickbrack Road. / 0.6 km away / 19 February 2026Refused
- F24A/0003Planning permission for the construction of / 0.6 km away / 14 August 2024Refused
- F24A/0011The development will consist of / 0.6 km away / 01 July 2024Refused