Convent Lane, Rush, Co. Dublin
Planning application F22A/0611
DecisionGrant permission
Decided21 March 2023
Application typePermission
Source documents11
Site
What is on file
0refusal reasons16conditions8nearby records
Proposed development
Application description published by Fingal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development must comply with terms and conditions of Planning Permission Reg. No. Reg Ref F18A/0539.Compliance
- 2Development must be carried out in accordance with plans, particulars, and specifications lodged with the application and as amended by additional information received 22nd February 2023.Compliance
- 3Grant relates to 2 no. residential units (i.e. 2 no. 4 bedroom houses).Occupancy
- 4Details of all external finishes must be submitted to and agreed in writing with the Planning Authority prior to commencement.Design Materials
- 5Revised plans must be submitted/agreed: (a) 1.8m high screen panel at balconies western elevation to prevent overlooking. (b) Proposed site boundary treatments.Design Materials
- 6All bathroom/en-suite windows must be fitted and permanently maintained with obscure glass. Film is not acceptable.Design Materials
- 7Access requirements: (i) Public footpath/raised table details agreed with Area Engineer. (ii) No objects >900mm in visibility triangle. (iii) Roads/parking meet Council standards. (iv) Stormwater to soakpits/drains within site. (v) Services relocated adjacent to new boundary. (vi) Works at Developer's expense per Council Specification.Traffic Access
- 8Surface water drainage: (i) No discharge into foul system. (ii) Compliance with Greater Dublin Regional Code of Practice for Drainage Works, Version 6.0, FCC, April 2006.Wastewater Drainage
- 9Water Services: (a) Sign connection agreement with Irish Water. (b) Compliance with Irish Water Standards.Water Services
- 10All public services (electrical, telephone cables, etc.) must be located underground throughout the entire site.Water Services
- 11No residential unit shall be occupied until all services are connected and operational.Occupancy
- 12Each house must be used as a single dwelling unit apart from exempted development.Occupancy
Planning a project near Convent Lane, Rush, Co. Dublin?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 57 pages of searchable text on file.Included in site brief
11 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 7 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
11 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- F18A/0539The development consists of the following: The demolition of existing / 0.0 km away / 30 September 2019Granted
- F24A/0457EThe development will consist of the demolition of the existing bungalo / 0.0 km away / 26 September 2024Granted
- F14B/0235Removal of existing garage / store and construction of (A) new bedroom / 0.0 km away / 30 October 2014Granted
- F24A/0455EThe development will consist of the demolition of the existing garage / 0.0 km away / 26 September 2024Granted
- F22B/0165Works to the existing residence, to include partial demolition and rem / 0.0 km away / 06 March 2023Granted
- F21A/0409The construction of a part single storey, part two storey, 3 no. bedro / 0.1 km away / 16 September 2021Granted
- F19A/02011/ Demolition of existing outhouses 2/ Construction of new two storey / 0.1 km away / 07 February 2020Granted
- F18A/00931/ Demolition of existing outhouses and 2/ Construction of 2 no. new s / 0.1 km away / 23 April 2018Granted