F22B/0209: Permission for detached domestic garage and all associated site works. AI received 15/02/23
Amberwell, Wyanstown, Oldtown, Co. Dublin
DecisionGrant permission
Decided09 March 2023
Application typePermission
Source documents12
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Amberwell, Wyanstown, Oldtown, Co. Dublin?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / 48976DD5764011EDB75B9C7BEFBB54FD.tif / Document 751055Source PDF
- Notification Of DecisionSource: planningapi.agileapplications.ie / 9F65A781BF5711EDB79D9C7BEFBB54FD.tif / Document 876961Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / 48976DD8764011EDB75B9C7BEFBB54FD.tif / Document 751056Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / 9F65A784BF5711EDB79D9C7BEFBB54FD.tif / Document 876962Source PDF
- Final GrantSource: planningapi.agileapplications.ie / 8CA005D4E05111EDB720DA1265959F2F.pdf / Document 874918Source PDF
- Planners ReportSource: planningapi.agileapplications.ie / 2FC36C78E2AD11EDA074D81265958418.pdf / Document 830709Source PDF
- ReportsSource: planningapi.agileapplications.ie / 10B33EBA6B2D11EDA54D4CEBBDB391AE.docx / Document 744003Source PDF
- ReportsSource: planningapi.agileapplications.ie / B77CC52A610D11ED867E0050569212E6.pdf / Document 764486Source PDF
- ReportsSource: planningapi.agileapplications.ie / 32CDC4ED604211ED867E0050569232A4.docx / Document 815506Source PDF
- ReportsSource: planningapi.agileapplications.ie / 69B8859CB42C11ED86860050569232A4.docx / Document 870726Source PDF
- ReportsSource: planningapi.agileapplications.ie / B618A21EB6BA11EDB6D04CEBBDB391AE.pdf / Document 879444Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- F24A/0536EPlanning Permission is sought by Sharon & Garrett Madigan for the following works: (i) Demolition of an existing flat roof single storey extension and balcony guarding to the rear of the existing dwelling (ii) Replacement of existing balcony door with new window (iii) Construction of a new flat roof single storey extension to the rear and side of the existing dwelling (iv) All associated drainage, site and landscaping works to facilitate the development. / 0.1 km away / 02 August 2024Granted
- F12A/0399One and a half storey dwelling and waste water treatment system. / 0.2 km away / 12 April 2013Granted
- F16A/0217The construction of a new two storey 4 bedroom detached dwelling house / 0.3 km away / 11 July 2016Granted
- F12B/0198Conversion of existing garage and single storey extension to side and / 0.4 km away / 17 December 2012Granted
- F23A/0455The proposed development consists of: (i) construction of a detached, two storey, four-bedroom dwelling with on-curtilage car parking and private amenity space; (ii) provision of on-site wastewater treatment system, percolation area and surface water soakaway to serve the proposed dwelling; (iii) provision of new vehicular entrance onto the R122 to west of the site; (iv) provision of solar panels at ground floor roof level on the eastern portion of the dwelling; (v) the provision of 1 no. rooflight to the rear; and (vi) the development will also include all associated works including, landscaping, planting and boundary treatments, infrastructure, lighting, foul/surface drainage and all ancillary site works necessary to facilitate the development. AI rcvd 30/11/2023 / 0.6 km away / 19 December 2023Granted
- F13A/0235Demolition of the existing house and sheds to rear with the constructi / 0.6 km away / 31 October 2013Granted
- F12B/0196Demolition of existing single storey garage adjacent to the existing h / 0.7 km away / 14 December 2012Granted
- F24A/0670EThe development consists of a temporary wastewater pre-treatment plant connected to the public wastewater sewer, including block retaining walls, enclosure fence and associated site works. As per the Uisce Éireann Connection Agreement, the plant is temporary pending Uisce Éireann’s upgrade of the local wastewater treatment infrastructure. The temporary plant will be disconnected and decommissioned on completion of the upgrade, the development will be removed and the land levelled and seeded and restored to its function as public open space in accordance with Planning Permission F17A/0357. The system is self-contained and there is no percolation area or other ground discharge system associated with the plant. / 0.7 km away / 16 September 2024Granted