F23A/0202: A Detached storey and a half house, waste water treatment unit, percolation area, detached garage, enlarged site entrance and all associated site works.
Balcunnin, Skerries, Co Dublin
DecisionRefuse permission
Decided20 June 2023
Application typePermission
Source documents8
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / BDE36C5A110911EEB7E19C7BEFBB54FD.tif / Document 880603Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / BDE36C5D110911EEB7E19C7BEFBB54FD.tif / Document 880604Source PDF
- ReportsSource: planningapi.agileapplications.ie / 00120004FFB911ED9032B05CDAAC4CDB.docx / Document 825572Source PDF
- ReportsSource: planningapi.agileapplications.ie / 29176A43091011EEB93B84C5A60C64E0.docx / Document 830081Source PDF
- ReportsSource: planningapi.agileapplications.ie / 3FF0A8120AA111EEB721D03C1F93414D.docx / Document 865534Source PDF
- ReportsSource: planningapi.agileapplications.ie / 5D57DF1FE9C011ED861D005056926A5C.pdf / Document 869089Source PDF
- ReportsSource: planningapi.agileapplications.ie / E3A84BB0FE2411EDB714D03C1F93414D.pdf / Document 884741Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- F22A/0648The development will consist of a detached two storey house, waste water treatment unit, percolation area, detached garage, enlarged site entrance and all associated site works. / 0.0 km away / 24 January 2023Refused
- F24A/0454Intend to apply for planning permission for A. Single and two storey domestic extension to rear B. All associated site works AI Rcvd 17/1/2025 / 0.4 km away / 13 February 2025Refused
- F25A/0604Intend to apply for Planning Permission, A. Single and two storey extensions to rear, B. Waste water treatment system servicing same, C. All associated site works. / 0.4 km away / 22 August 2025Refused
- F14A/0372A storey and a half dwelling with waste water treatment system and per / 0.5 km away / 03 November 2014Refused
- F19A/0068A storey & a half dwelling with vehicular entrance to public road dome / 0.8 km away / 08 April 2019Refused
- F18A/0614A storey & a half dwelling with vehicular entrance to public road dome / 0.8 km away / 19 December 2018Refused
- F11A/0351Single storey dwelling and garage, waste water treatment system and pe / 1.0 km away / 17 November 2011Refused
- F24A/1162EThe development of an Anaerobic Digestion (AD) Facility to produce a renewable biomethane gas for direct injection into the national gas grid on a site of circa 7.28 hectares at the townland of Collinstown, Lusk, Co Dublin. The development comprises of AD tanks and processing equipment, feedstock storage facilities and equipment, silage storage clamps, digestate management and storage facilities. Carbon dioxide from the production of this biomethane will be captured for reuse in the Irish food industry. The proposed supporting infrastructure to be developed includes inter alia, 1 no. 45m diameter combined primary and secondary digestion tank (8.5m high, 7947m³ & 3981m³ respectively) & attached pumping unit, 1 no reception tank (5m high, 250 m³) & attached pumping unit, 1 no. 32m diameter power digest tank & attached gas sphere (12m high, 4.825m³ & 3130 m³ respectively) & attached pumping unit, 1 no. digestate separator building (119.5 m2), 1 no. pasteurization unit & hygenization buffer tank, 1 no. gas upgrading unit, 1 no. gas pre-treatment unit, 1 no. gas valve chamber, 1 no. gas flare (9m high), 1 no. GNI gas injection unit (25.1 m2) with an underground gas pipeline to the gas grid connection adjacent the site to the west, 1 no. combined heat and power unit, 2 no. boiler containers, 1 no. oxygen compound, 1 no. heat distribution container, 1 no. switchboard container, 1 no. carbon dioxide liquefaction unit, 2 no. weighbridges & integrated lever arms & access control & attached bio security units, 1 no. single-storey office and administration building (123 m2), 1 no. ESB sub-station (66 m2), 1 no. enclosed feedstock reception building (1527 m2), 1 no. odour abatement machinery (with 14m high chimney), Silage clamps (8m high), 1 no. machinery shed (309.4 m2), 1 no. services building (288.6 m2), 1 no. solid digestate storage building (484.1 m2), 2 no. covered digestate lagoons, attached pumping building (30 m2) and attached digestate loading-unloading areas, roof mounted solar arrays / photovoltaic panels, all associated car and bicycle parking, internal road layouts, earthen berms, site retaining walls, palisade fencing and boundary treatments, hard surface and bunded areas for housing supporting plant, processing and storage facilities and all associated site works. All accessed by the existing Country Crest internal road network which uses as public roadway access point to the L1155 Man o War Road. The facility requires an Industrial Emissions Licence from the EPA and is accompanied by a Natura Impact Statement (NIS) and an Environmental Impact Assessment Report (EIAR). / 1.1 km away / 20 February 2025Refused