21 Kellys Bay Beach, Skerries, Co. Dublin
Planning application F23A/0517
DecisionGrant permission
Decided24 October 2023
Application typePermission
Source documents3
Site
What is on file
0refusal reasons10conditions8nearby records
Proposed development
Application description published by Fingal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development to be carried out in accordance with lodged plans.Compliance
- 2Revised drawings submitted prior to commencement for dormer width (max 3.0m) and setback (300mm below ridge).Other
- 3Attic floor space not compliant with Building Regulations for habitable standards shall not be used for human habitation.Occupancy
- 4Premises to be used as a single dwelling unit apart from exempted development.Compliance
- 5External finishes to accord with Drawing No. 2023-07-06. Stairwell window to be fitted with permanently maintained obscured glazing.Design Materials
- 6Construction hours restricted to 8am-7pm Mon-Fri, 8am-2pm Sat. No work on Sundays or Bank Holidays.Construction Management
- 7Prevent spillage of debris on adjoining roads. Developer responsible for full cost of repair for any damage to public road.Construction Management
- 8Security for provision and completion of services (roads, open spaces, car parks, drains) required prior to commencement (Bond or Cash Sum).Water Services
- 9Financial contribution for open space provision in accordance with Fingal Development Plan.Development Contribution
- 10Financial contribution for public infrastructure and facilities in accordance with Contribution Scheme for Fingal County.Development Contribution
Planning a project near 21 Kellys Bay Beach, Skerries, Co. Dublin?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 16 pages of searchable text on file.Included in site brief
3 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 2 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
3 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- F20B/0062Permission for first floor extension over existing ground floor exten / 0.0 km away / 17 June 2020Granted
- F19B/0168Permission for an attic conversion with dormer window to rear, rooflig / 0.0 km away / 19 August 2019Granted
- F23A/0199Development will consist of a proposed new dormer roof to the rear & f / 0.0 km away / 20 June 2023Granted
- F25A/0886EPlanning Permission for conversion of attic space to home office, exte / 0.0 km away / 18 December 2025Granted
- F21B/0331Permission for building up of existing west facing gable wall to meet / 0.0 km away / 17 November 2021Granted
- F19A/0371The proposed widening of an existing vehicular entrance to the front a / 0.0 km away / 08 October 2019Granted
- F14B/0181Construction of an attic conversion with raised gable wall to side and / 0.0 km away / 06 November 2014Granted
- F22B/0074Remove the existing hipped roof and construct a new roof with gable / 0.1 km away / 10 May 2022Granted