F23A/0717: NIS Irish Rail propose to undertake Strengthening works to an existing Overhead Line Electrification Equipment (OHLE) Mast and stay wire on the Dublin to Belfast Railway Line close to the Southern end of the existing Malahide Railway Viaduct at Strand St/Bisset's Strand Malahide. The works are necessary to strengthen the foundations of the existing OHLE Mast and Stay to allow the Construction of the proposed new Broadmeadow Way footbridge. The works are located in the Malahide SAC/SPA Nature site. A Natura Impact Statement accompanies the planning application.
On the Dublin to Belfast Railway Line, close to the southern end of th
DecisionGrant permission
Decided18 January 2024
Application typePermission
Source documents4
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Chief Executives OrderSource: planningapi.agileapplications.ie / F23A_0717_CE.pdf / Document 904126Source PDF
- Final GrantSource: planningapi.agileapplications.ie / F23A_0717_FG.pdf / Document 909303Source PDF
- ReportsSource: planningapi.agileapplications.ie / 00113457_E0016K6E_20231129_1820.pdf / Document 896819Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- F14A/0166Change of use of a disused 2-storey factory and retail unit to a crech / 0.2 km away / 21 October 2014Granted
- F19A/0313Change of use from Health Studio and office use to 2 no. Montessori rooms at first floor including material alterations comprising (1) Remove the current kitchenette and replace with new 4 no. new toilets. (2) Create a new lobby which will allow access to the new rooms. (3) Remove existing wall separating current toddler room and cot room at ground floor to increase room size and relocate the cot room to the playschool room. Add Info received 26th November 2019. / 0.2 km away / 08 January 2020Granted
- F16A/0386Retention of the following modifications to the approved development ( / 0.2 km away / 27 October 2016Granted
- F22A/0026Permission for the construction of a) office extension (144 m2) and associated external terraces below part of existing offices and b) new glass canopy at entrance. AI received 5/4/2022 / 0.3 km away / 25 April 2022Granted
- F19A/0219Change of use from restaurant to office at existing two storey buildin / 0.3 km away / 15 July 2019Granted
- F22A/0198The retention and continued use of the unit (40.6 sq.m) approved as an Estate Management Office to serve the Malahide Marina Village development under Reg. Ref. F95A/0248 as a General Estate Management Office. / 0.4 km away / 07 June 2022Granted
- F12B/0079Retention permission for the existing attic conversion, including two / 0.4 km away / 25 June 2012Granted
- F24A/0313EPlanning permission is sought for: / 0.4 km away / 14 May 2024Granted