F24A/0676E: A rear and side ground floor extension totaling 36.7 square meters. 32.2 sq m to the side and 4.5 sq m to the rear with a max height of 3.3m from Finished Floor Level.
1, Strand Court, Malahide, K36 Y290
DecisionGrant permission
Decided17 September 2024
Application typePermission
Source documents5
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near 1, Strand Court, Malahide, K36 Y290?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / F24A.0676E__D.pdf / Document 1056387Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / F24A.0676E_CE.pdf / Document 1056388Source PDF
- Final GrantSource: planningapi.agileapplications.ie / F24A_0676E_FG.pdf / Document 1062772Source PDF
- ReportsSource: planningapi.agileapplications.ie / F24a-0676e-endorsed.docx / Document 1052109Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- F20A/0578Permission for the change of use from dance studio unit to physiotherapy unit. Alterations include conversion of 2 no. existing changing rooms to 2 no. physiotherapy treatment rooms with new signage over front entrance with ancillary works. Add info received 11th February 2021. / 0.0 km away / 08 March 2021Granted
- F13A/0390Change of use from retail bakery and delicatessen to restaurant with a / 0.0 km away / 02 December 2013Granted
- F11A/0332Change of use from residential to office use. / 0.1 km away / 28 October 2011Granted
- F12A/0260Change of use from previously granted office use under Planning Refere / 0.1 km away / 19 November 2012Granted
- F21A/0143The formation of additional dental surgery consulting room within the existing floor area and a single storey extension providing 12m2 additional floor area to the rear of the existing dental practice for a new staff room and office together with all associated site works. / 0.1 km away / 02 September 2021Granted
- F20B/0225Permission for the construction of a new first floor bedroom, with ensuite and bathroom, floor area of 25.2 sqm, with all associated site works necessary to facilitate the development. Add Info received 24th March 2021. / 0.1 km away / 19 April 2021Granted
- F14B/0162Single storey extension to side and rear, internal alterations, replac / 0.1 km away / 11 August 2014Granted
- F24A/0606EThe development will consist of the partial change of use of an existing 2 storey residential building on site to provide for a new café at ground floor level (approx. 73 sq m) and a new 2-bedroom apartment at first floor level (approx. 74 sq m) with associated development works including a new 2-storey extension to the rear with pitched roof detailing. Access to the apartment will be via the existing side access. Open space for the apartment will be at ground floor level to the rear of the property. Minor modifications to the windows and the provision of wall mounted signage on the front elevation are sought to the property along Railway Avenue to facilitate the café use. The development will also comprise a 2-storey residential mews to the rear of the site, to provide a 3-bedroom dwelling (approx. 120 sq m) with associated open space and courtyard areas. Access to the mews will be via the existing side access. The development will also comprise all necessary site development works including services provision, infrastructural and drainage works, changes to the opes of the existing dwelling unit, bin stores, bicycle stores, as well as all landscape and boundary treatment works. AI Received 22/01/2025 / 0.1 km away / 17 February 2025Granted