F25A/0379E: The development to be retained consists of an existing sign on western elevation of the hotel. The proposed development will consist of the removal of this existing sign, the erection of a replacement sign (17.045m x 1.62m, luminated by white LEDs, giving full face static illumination) and all other associated site development works. Additional information received 18/08/2025
Clayton Hotel Dublin Airport, Stockhole Lane, Cloghran, Swords, Co. Du
DecisionGrant permission & grant retention
Decided08 September 2025
Application typePermission and Retention
Source documents11
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Clayton Hotel Dublin Airport, Stockhole Lane, Cloghran, Swords, Co. Du?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / F25A.0379E_D.pdf / Document 1115290Source PDF
- Notification Of DecisionSource: planningapi.agileapplications.ie / F25A.0379E_D.pdf / Document 1131227Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / F25A.0379E_ce.pdf / Document 1115289Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / F25A.0379E_ce.pdf / Document 1131226Source PDF
- Final GrantSource: planningapi.agileapplications.ie / F25A_0379E.pdf / Document 1140081Source PDF
- ReportsSource: planningapi.agileapplications.ie / F25A-0379E-Transport_Infrastructure_Ireland.pdf / Document 1106402Source PDF
- ReportsSource: planningapi.agileapplications.ie / PL_Report_F25A_0379E.docx / Document 1106414Source PDF
- ReportsSource: planningapi.agileapplications.ie / F25A-0379E.pdf / Document 1109602Source PDF
- ReportsSource: planningapi.agileapplications.ie / F25A0379E.docx / Document 1110180Source PDF
- ReportsSource: planningapi.agileapplications.ie / PL_Report_F25A_0379E_AI.docx / Document 1127288Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- F18A/0042The proposed development will consist of the erection of a freestandin / 0.0 km away / 15 March 2018Granted
- F16A/04371) At upper basement level, a new store room (163sq.m.); 2) At ground / 0.0 km away / 29 November 2016Granted
- F14A/0465Development including new buildings and alterations to Bewleys Hotel D / 0.1 km away / 29 July 2015Granted
- F14A/0250Construction of a new ESB sub-station ancillary to a previously grante / 0.1 km away / 12 August 2014Granted
- F25A/0862EThe development predominantly comprises of retention permission for various amendments to the development permitted under Fingal County Council Planning Reference F22A/0079. Specifically, 1 no. additional high power electric vehicle charging unit, 6 no. additional parking spaces, and bollards, existing modular substation in lieu of previously approved substation, 3 no. additional lighting columns, various signage elements, and all associated site development works. Plus permission for proposed c 1.2 - 2.0m high hedging and low level planting between EV charging facilities and road. / 0.1 km away / 17 November 2025Granted
- F22A/0079The development will consist of the: (i) Installation of 4 no. electric vehicle charging bays, each comprising a parking space and electric vehicle charging units, (ii) Installation of electric vehicle power units, (iii) Construction of a new substation, (iv) Erection of associated signage, (v) All assoiated lighting, infrastructure and site development works. / 0.1 km away / 12 April 2022Granted
- F08A/1305/E1A 325 bedroom hotel with associated spa and leisure facilities, meetin / 0.2 km away / 04 December 2014Granted
- F16A/0579Development on a site of approximately 1.35 hectares located west of S / 0.2 km away / 28 March 2017Granted