F25A/0503E: Planning permission is sought for new detached dwellinghouse along with on site wastewater treatment system & percolation area, surface water soakaway along with all associated site works including widening of existing vehicular entrance, removal of existing septic tank and installation of new treatment system & percolation area for existing dwellinghouse.
Secret Garden, Flemington, Balbriggan, Co. Dublin, K32 RX36
DecisionRefuse permission
Decided30 July 2025
Application typePermission
Source documents9
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Fingal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / F25A.0503E_D.pdf / Document 1123547Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / F25A.0503E_ce.pdf / Document 1123546Source PDF
- ReportsSource: planningapi.agileapplications.ie / Rory_costello_-_arc_design_services_-_surface_water_rep.pdf / Document 1111626Source PDF
- ReportsSource: planningapi.agileapplications.ie / Joe_costello_-_arc_design_services_-_foul_water_report.pdf / Document 1111627Source PDF
- ReportsSource: planningapi.agileapplications.ie / Rory_costello_-_arc_design_services_-_foul_water_report.pdf / Document 1111628Source PDF
- ReportsSource: planningapi.agileapplications.ie / F25A0503E.docx / Document 1117809Source PDF
- ReportsSource: planningapi.agileapplications.ie / F25A_0503E.docx / Document 1119414Source PDF
- ReportsSource: planningapi.agileapplications.ie / F25A-0503E.docx / Document 1121002Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- F21A/0399Phase 1 of 2 Phase Masterplan for a Residential and Community Services development. The proposed Phase 1 will consist of the removal of the existing derelict structure and the construction of 81 no. residential units (28 no. Duplex Units serviced by 55 no. surface car parking spaces and 76 no. bicycle parking spaces. 11 no. 2-bed, 35 no. 3-bed and 7 no. 4-bed dwellings serviced by 95 no. surface car parking spaces), public and communal open space, children's play area, provision of new access roadway from Flemington Lane and all associated site works, landscaping and boundary treatments to facilitate the development. / 0.2 km away / 16 September 2021Refused
- F25A/0643EPlanning Permission is requested for a proposed single-storey extension to side & rear of existing dwelling house to include a self-contained family-flat along with associated siteworks. / 0.2 km away / 08 September 2025Refused
- SHD/019/21To view details of this development please visit www.flemingtonshd.ie ABP 314446 Kinvara Properties Limited intend to apply for permission for a strategic housing development with a total planning application site area of c. 44,365m2 (4.4Ha) with a developable Area of 34,135m2 (3.4Ha) with a substantive residential site development area of c.7.2 ha. The subject property is located off Flemington Lane, approximately 150m East of the junction with Flemington Road and approximately 4km North-west of Balbriggan Town Centre. The proposed development consists of the removal of an existing derelict structure of 134sqm and the construction of 127 no. residential units (14 no. 2-bed dwelling units of 93sqm, 47 no. 3-bed dwelling units of 109sqm, 4 no. 4-bed dwelling units of 145sqm and 31 no. 2-bed ground floor duplex units with 31 no. 3-bed duplex units over, of 204sqm), surface car parking (211 no. spaces in total, including accessible spaces); car sharing provision; electric vehicle charging points; bicycle parking (long and short stay spaces for duplex) including visitor spaces; internal roads, pathways and cycle paths, including connections to adjoining lands; hard and soft landscaping and boundary treatments; temporary pumping station; plant; revised entrances and tie-in arrangements to Flemington Lane including new cycle lane and footpath; solar panels; attenuation tank and related SUDS measures; signage; public lighting; and all site development and excavation works above and below ground. The development also includes a two storey creche of 528sqm with 9no. dedicated car parking (including 2no. disabled persons spaces) and secure open play space; public open space of 4130m2 and communal open space of 681sqm, provision of public open space in Zoned OS "Open Space" of 10,230sqm including children's play area and public artwork, provision of a new access roadway from Flemington Lane and future road connection to adjoining lands to the south-eastern boundary) and all associated site works, landscaping and boundary treatments to facilitate the development. The total gross area of the development is 13,869sqm with a unit density of 37.4 units per hectare. The application contains a statement setting out how the proposal will be consistent with the objectives of the Fingal Development Plan 2017-2023. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. The application may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Fingal County Council. The application may also be inspected online at the following website set up by the applicant: www.flemingtonshd.ie. Any person may, within the period of 5 weeks beginning on the date of receipt by An Bord Pleanála of the application and on payment of the prescribed fee of €20 (except for certain prescribed bodies), make a submission or observations in writing to An Bord Pleanála, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie relating to the implications of the proposed development, if carried out, for proper planning and sustainable development in the area or areas concerned, and the likely effects on the environment or the likely effects on a European site, as the case may be, of the proposed development, if carried out. Submissions or observations duly made will be considered by An Bord Pleanála in making a decision on the application. Such submissions or observations must also include the following information: (a) the name of the person, authority or body making the submission or observations, the name of the person, if any, acting on behalf of that person, authority or body, and the address to which any correspondence relating to the application should be sent, (b) the subject matter of the submission or observations, and (c) the reasons, considerations and arguments on which the submission or observations is or are based. An Bord Pleanála may grant permission for the strategic housing development as proposed, or may grant permission subject to such modifications as it specifies in its decision, or may grant permission in part only, with or without any other modifications it may specify in its decision, or may refuse to grant permission for the proposed development. An Bord Pleanála may attach to a grant of permission such conditions as it considers appropriate. Any enquiries relating to the application process should be directed to the Strategic Housing Development Section of An Bord Pleanála (Tel. 01-8588100). A person may question the validity of a decision of An Bord Pleanála by way of an application for judicial review, under Order 84 of the Rules of the Superior Courts (S.I. No. 15 of 1986), in accordance with sections 50 and 50A of the Planning and Development Act 2000 (No. 30 of 2000), as amended. Practical information on the review mechanism can be found in the Judicial Review Notice on the An Bord Pleanála website: www.pleanala.ie or on the Citizens Information Service website: www.citizensinformation.ie. / 0.3 km away / 22 March 2023Refused
- F16B/0101Demolition of existing lean to structure to rear of existing cottage, / 0.3 km away / 08 June 2016Refused
- F15A/0326Dormer bungalow dwelling with waste water treatment system and all ass / 0.4 km away / 09 November 2015Refused
- F14A/0334Retention permission of the existing 30 metre high telecommunications / 0.5 km away / 07 October 2014Refused
- F25A/0818EThe development will consist of the installation of a 30-metre-high multiuser lattice structure carrying antennas, dishes, remote radio units (RRUs), associated equipment, together with ground-based equipment cabinets, GPS, palisade fencing, gantry poles, cable ladder, cable tray, concrete plinths relocation of existing solar panel on proposed concrete plinth and all associated site development works for wireless data and broadband services. / 0.5 km away / 24 October 2025Refused
- F25A/0642EPlanning Permission is requested for retention of 3no. single storey sheds within existing farmyard for use as storage / warehousing. / 0.5 km away / 08 September 2025Refused